Loading...
HomeMy WebLinkAbout0104313-Building (raze garage)OSHKOSH ON THE WATER · Job Address 133 BROCKWAY AVE Designer Category Type (~ Building O Sign Zoning CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner STEVEN KWIEGMANN Contractor OWNER 162 - Wrecking Residential Accessory Structures No 104313 Create Date 09/22/2003 Plan (~) Canopy (~ Fence O Raze I Class of Const: Size Unfinished/Basement Finished/Living Garage Foundation Occupancy Permit Park Dedication 0 Sq. Ft. Rooms 0 Sq. Ft. Bedrooms 0 Sq. Ft. Baths Poured Concrete O Floating Slab (~ Pier Concrete Block O Post Not Required 0 Height 0 Ft. [] Projection 0 Stories Canopies 0 Signs Other (~) Treated Wood Flood Plain Height Permit # Dwelling Units 0 # Structures Use/Nature of Work 3ONVERT RENTAL TO SINGLE FAMILY/Razing the existing detached garage. Matt Tucker talked with the owner and approved )arking in the dfivaway. HVAC Contractor Electric Contractor Fees: Valuation issued By: ~ $200.00 Plan Approval Plumbing Contractor $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Date 09/22/2003 Final/O.P. 00/00/0000 [] Permit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature,, 4/~¢2..~--~~ ~¢/'~ ~. ~ Agent/Owner Address 4509 WAGON TRAIL RD OSHKOSH WI 54904 - 9380 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.