HomeMy WebLinkAbout0104313-Building (raze garage)OSHKOSH
ON THE WATER
· Job Address 133 BROCKWAY AVE
Designer
Category
Type (~ Building O Sign
Zoning
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner STEVEN KWIEGMANN
Contractor OWNER
162 - Wrecking Residential Accessory Structures
No 104313
Create Date 09/22/2003
Plan
(~) Canopy (~ Fence O Raze I
Class of Const: Size
Unfinished/Basement
Finished/Living
Garage
Foundation
Occupancy Permit
Park Dedication
0 Sq. Ft. Rooms
0 Sq. Ft. Bedrooms
0 Sq. Ft. Baths
Poured Concrete O Floating Slab (~ Pier
Concrete Block O Post
Not Required
0 Height 0 Ft. [] Projection
0 Stories Canopies
0 Signs
Other
(~) Treated Wood
Flood Plain Height Permit
# Dwelling Units 0 # Structures
Use/Nature
of Work
3ONVERT RENTAL TO SINGLE FAMILY/Razing the existing detached garage. Matt Tucker talked with the owner and approved
)arking in the dfivaway.
HVAC Contractor
Electric Contractor
Fees: Valuation
issued By: ~
$200.00 Plan Approval
Plumbing Contractor
$0.00 Permit Fee Paid $20.00 Park Dedication $0.00
Date 09/22/2003 Final/O.P. 00/00/0000
[] Permit Voided
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature,, 4/~¢2..~--~~ ~¢/'~
~. ~ Agent/Owner
Address 4509 WAGON TRAIL RD OSHKOSH WI 54904 - 9380 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.