HomeMy WebLinkAbout0156969-Building � CITY OF OSHKOSH No 156969
�•
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 433 MONROE ST Owner LINDA M MONROE Create Date 07/01/2013
Designer Contractor OWNER
Inspector John Zarate
Category 111 -Single Family Addition Plan File
Type � Building 0 Sign � Canopy � Fence � Raze I
Zoning R-2 Class of Const:
Size
Unfinished/Basement 288 Sq.Ft. Rooms Height Ft. ❑ Projection j
Finished/Living 414 Sq.Ft. Bedrooms Stories Canopies
Garage Sq.Ft. Baths Signs
Foundation � Poured Concrete � Floating Slab � Pier 0 Other
� Concrete Block � Post � Treated Wood — _
Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit
Park Dedication _ #Dwelling Units 0 #Structures 0
Use/Nature SFR/16'x 18'Addition'to be used as a masterbedroom. An existing bedroom will be converted into closet and bathroom.
of Work '
i
HVAC Contractor Plumbing Contractor HOMEOWNER
Electric Contractor HOMEOWNER
Fees: Valuation $10,400.00 Plan Approval $50.00 Permit Fee Paid $151.36 Park Dedication $0.00
�
Issued By: Date 07/30/2013 Final/O.P. 00/00/0000
❑ Permit Voided'i Parcel Id#0404160000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to secure any necessary approvals before starting such activity.
I have read and underst/an/�).the afore mentioned information.
Signature '7'L �M!'��C.���i2by�ry� Date I(� �-��} ./�
Agent/Owner
Address Oshkosh WI 54901 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not pertormed within two business days from the time the project is ready.