Loading...
HomeMy WebLinkAbout0156969-Building � CITY OF OSHKOSH No 156969 �• OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 433 MONROE ST Owner LINDA M MONROE Create Date 07/01/2013 Designer Contractor OWNER Inspector John Zarate Category 111 -Single Family Addition Plan File Type � Building 0 Sign � Canopy � Fence � Raze I Zoning R-2 Class of Const: Size Unfinished/Basement 288 Sq.Ft. Rooms Height Ft. ❑ Projection j Finished/Living 414 Sq.Ft. Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation � Poured Concrete � Floating Slab � Pier 0 Other � Concrete Block � Post � Treated Wood — _ Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication _ #Dwelling Units 0 #Structures 0 Use/Nature SFR/16'x 18'Addition'to be used as a masterbedroom. An existing bedroom will be converted into closet and bathroom. of Work ' i HVAC Contractor Plumbing Contractor HOMEOWNER Electric Contractor HOMEOWNER Fees: Valuation $10,400.00 Plan Approval $50.00 Permit Fee Paid $151.36 Park Dedication $0.00 � Issued By: Date 07/30/2013 Final/O.P. 00/00/0000 ❑ Permit Voided'i Parcel Id#0404160000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. I have read and underst/an/�).the afore mentioned information. Signature '7'L �M!'��C.���i2by�ry� Date I(� �-��} ./� Agent/Owner Address Oshkosh WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not pertormed within two business days from the time the project is ready.