Loading...
HomeMy WebLinkAbout157128 building (replace windows) � CITY OF OSHKOSH No 157128 � OSHKOSH COMMERCIAL BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 915 HAZEL ST Create Date 08/08/2013 Project Window replacement __ Project Number 0 Owner OSH AREA SCHL DIST WEBSTER STANLEY Plan Contractor LUECKS HOME IMPROVEMENT INC Inspector John Zarate Designer Category 229-Alteration Schools 8�other Educational Type of Plan Zoning R-1 Square Footage Major Occ Const Class Fire Protection � Sprinkled C� Unsprinkled � Sprinkler Design Occupancy Permit Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 � Projection Canopies Signs Use/Nature of Work COMM/replacing 169 windows same size and location/no structural work involved I HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $131,490.00 Plan Approval $0.00 Permit Fee Paid $552.00 Park Dedication $0.00 -- —� Issued By: �='s , Date 08/08/2013 FinallO.P. 00/00/000o � Permit Voided� Parcel Id# 1110240000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. I have read and nd t nd t ore mentioned information. �/� Signature � Date �:� AgenVOwner Address 706 S MAI�STREET OSHKOSH WI 54902 - 6084 Telephone Number 235-0106 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection (i.e. Footing,Service, Final, etc.),Access into Building if Secure(how do we gain entryj,your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. CITY OF OSHKOSH WATER DISTRIBLTTION