Loading...
HomeMy WebLinkAbout0104293-Building (garage)OSHKOSH ON THE WATER Job Address 1508 W BENT AVE Designer Category Type · Building Zoning Unfinished/Basement Finished/Living CITY OF OSHKOSH No 104293 BUILDING PERMIT - APPLICATION AND RECORD Owner DAVID M RESOP Create Date 09/19/2003 Contractor 149 - Raze detached garage, construct detached garage BEST BUILT GARAGE BUILDERS (~) Sign (~) Canopy O Fence (~) Raze 0 Sq. Ft. 0 Sq. Ft. 0 Sq. Ft. Plan Garage Foundation · Poured Concrete (~ Floating Slab (~ Concrete Block (~ Post Occupancy Permit Park Dedication Class of Const: Size Rooms 0 Height 0 Ft. [] Proje~ion Bedrooms 0 Stories Canopies Baths 0 Signs (~) Pier O Other O Treated Wood Flood Plain Height Permit # Dwelling Units 0 # Structures 0 Use/Nature of Work SFPJ Razing the existing 2 car detached garage and constructing a 24'x28' detached garage. This permit also includes paving a portion of the driveway. HVAC Contractor Electric Contractor UNKNOWN???? Fees: Valua~on~ ~], $16,000.00 Issued By: ~ Plan Approval Plumbing Contractor $0.00 Permit Fee Paid [] Permit VoidedJ $83.00 Park Dedication $0.00 Date 09/19/2003 Final/O.P. 00/00/0000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a par[y, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) an~ne~.._~_.~provals bef~ start~a,~viy. ( I r Agent/Owner Address PO BOX 317 MARSHALL WI 53559 - 0000 Telephone Number 920-722-7350 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc,), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ZONING/LAND USE COMPLIANCE CHECKUST JOB LOCATION: I~-~ U,~ ~ PROPERTY O~CT.~: '~5'~ CONS~UCTION DATA: ,, ~ New Cons~on Add,ion ~PE OF CONS~UC~ON: (i.e. fen~, pool, pa~g lot, sign, em.) ~ ~ COMPLIANCE CHECKLIST DEFICIENT Alteration Lot Width Lot Area Lot Area Per Family Floodplain Front Yard Front Yard Side Street Rear Yard Side Yards Building Area Parking Standards Off-Street Loading Standards Vision Clearance Transitional Yard Standards Landscape Standards Height Conditions of Approval Compliance with P.C. or BZA Conditions of Approval Signage Standards Drainage Plan REVIEW AUTHORITY As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approval all plans, except the following: (1) Alterations or interior work when the use is conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows; etc., when the use is confo,_~ and when no change is proposed. APPROVED DENIED Plan Commission Action Required Variance(s) Required REVIEWED BY: