HomeMy WebLinkAbout0104293-Building (garage)OSHKOSH
ON THE WATER
Job Address 1508 W BENT AVE
Designer
Category
Type · Building
Zoning
Unfinished/Basement
Finished/Living
CITY OF OSHKOSH No 104293
BUILDING PERMIT - APPLICATION AND RECORD
Owner DAVID M RESOP Create Date 09/19/2003
Contractor
149 - Raze detached garage, construct detached garage
BEST BUILT GARAGE BUILDERS
(~) Sign (~) Canopy O Fence (~) Raze
0 Sq. Ft.
0 Sq. Ft.
0 Sq. Ft.
Plan
Garage
Foundation · Poured Concrete (~ Floating Slab
(~ Concrete Block (~ Post
Occupancy Permit
Park Dedication
Class of Const: Size
Rooms 0 Height 0 Ft. [] Proje~ion
Bedrooms 0 Stories Canopies
Baths 0 Signs
(~) Pier O Other
O Treated Wood
Flood Plain Height Permit
# Dwelling Units 0 # Structures 0
Use/Nature
of Work
SFPJ Razing the existing 2 car detached garage and constructing a 24'x28' detached garage. This permit also includes paving a portion
of the driveway.
HVAC Contractor
Electric Contractor UNKNOWN????
Fees: Valua~on~ ~], $16,000.00
Issued By: ~
Plan Approval
Plumbing Contractor
$0.00 Permit Fee Paid
[] Permit VoidedJ
$83.00 Park Dedication $0.00
Date 09/19/2003 Final/O.P. 00/00/0000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a par[y, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) an~ne~.._~_.~provals bef~ start~a,~viy.
( I r Agent/Owner
Address PO BOX 317 MARSHALL WI 53559 - 0000 Telephone Number 920-722-7350
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc,), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
ZONING/LAND USE COMPLIANCE CHECKUST
JOB LOCATION: I~-~ U,~ ~
PROPERTY O~CT.~: '~5'~
CONS~UCTION DATA: ,, ~ New Cons~on Add,ion
~PE OF CONS~UC~ON: (i.e. fen~, pool, pa~g lot, sign, em.) ~ ~
COMPLIANCE CHECKLIST
DEFICIENT
Alteration
Lot Width
Lot Area
Lot Area Per Family
Floodplain
Front Yard
Front Yard Side Street
Rear Yard
Side Yards
Building Area
Parking Standards
Off-Street Loading Standards
Vision Clearance
Transitional Yard Standards
Landscape Standards
Height
Conditions of Approval
Compliance with P.C. or
BZA Conditions of Approval
Signage Standards
Drainage Plan
REVIEW AUTHORITY
As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or
designee, must approval all plans, except the following: (1) Alterations or interior work when the use is
conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows; etc.,
when the use is confo,_~ and when no change is proposed.
APPROVED DENIED
Plan Commission Action Required
Variance(s) Required
REVIEWED BY: