HomeMy WebLinkAbout157053 � CITY OF OSHKOSH No 157053
�
OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 1320 JUDY LEE CT Owner CHERYL A LAST Create Date 08/05/2013
Designer Contractor YELLOW JACKET CONSTRUCTION
Inspector Nicole Krahn
Category 041 -Residential Roofing _____ Plan ____ _
Type � Building __ � Sign � Canopy___ 0 Fence � Raze____ _ _�
Zoning R-1 Class of Const: Size __
UnfinishedlBasement Sq.Ft. Rooms Height _ __ Ft. ❑ Projection
Finished/Living Sq.Ft. Bedrooms Stories Canopies
Garage Sq.Ft. Baths Signs
Foundation � Poured Concrete � Floating Slab � Pier � Other
� Concrete Block � Post � Treated Wood
Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Not Required
Park Dedication Not Required #Dwelling Units 0 #Structures �
UselNature SFR/Tear off and replace existing roofing on house and garage due to hail damage. No structural changes.
of Work
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $10,210.63 Plan Approval $0.00 Permit Fee Paid $106.00 Park Dedication $0.00
Issued By: Date 08/05/2013 Final/O.P. 00/00l0000
� Permit Voided Parcel Id# 1343620000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work
described in this permit application 'thin an easement,the City strongly urges the permit applicant to contact the easement
holder(s) ecessa a ovals before starting such activity.
I have re and unde e afor e ' information.
Signature Date c� /,j
AgenUOwner
Address 961 BUTLER AVE WINNEBAGO WI 54985 - 0000 Telephone Number (920)231-8840
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not perFormed within two business days from the time the project is ready.
City of Oshkosh �
Inspection Services Division �
P O Box 1130
Oshkosh,WI 54903-1130
Phone:(920)236-5050 O.lHKO.IH
FaY:(920)236-5084
ON THF �VATER
Roofing & Siding Permit Application
• Application(s)and fee(s)can be brought to City Hall,Room 205 or mailed to Inspection Services, PO BoY 1128,
Oshkosh WI 54903-1128. Commencing work without permit(s)will result in fees being doubled or$100.00 plus the
normal permit fee, which ever is greater.
OR
If vou are a contractor participating in the Permit fee Account System and have adequate Junds check here
if vou want this processed through vour account n
JOB ADDRESS r � �� �(� � I �CI V l.'�✓'�✓` C�'+ O��
s �1
OWNER ����-�R � l �i I�^�
CONTRACTOR � � L(�t� � �c�C��[.�'� CC��S��c�C_�� C7 ✓1
I am the: ❑ Owner OR �ontractor
USE CATEGORY
�Sin�le Family ❑Duplex ❑Multi-Family ❑Rental ❑Co�runercial ❑Industrial
Work being done:
ROOFING
�—T'ear off and replace existing roofing on.L�`l house,�garage
❑Replace wood decking
❑Add 1 layer of roofing to the existing ]ayer(s)on❑house,❑garage
This work is being done due to�Hail Damage ❑Other
SIDING
❑Install siding on ❑house, ❑garage
❑Replacing vinyl with vinyl
❑Replacing steel or aluminum with vinyl(circle steel or aluminum)
❑Replacing witl�
This work is being done due to�Hail Damage �Other
When siding is done,one of the boxes below must be checked:
1) ❑Electric—Existing Electric Meter,receptacle,lighting and Electric Service entrance alterations/modiYications are being performed
by
(Name of Licensed Electric Contractor)
AND C�Electric Installation Verification forin is attached OR ❑Separate Elect Permit will be requested.
2) ❑Electric—Not Applicable because: �.J Blocks previously installed. L No outside lights. ❑Other
❑Install new or O Replace gutters
❑Install new or❑Replace downspouts
Other related work being done: (please note)
Value of the job $ f O � �I �. ��(include fair market price for labor even ifyou are not paying for]abor) 03/02