Loading...
HomeMy WebLinkAbout0157100-Plumbing (addn to #155336) � CITY OF OSHKOSH OSHKOSH No 157100 ON THE WATER PLUMBING PERMIT -APPLICATION AND RECORD Job Address 2300 WHITE SWAN DR Contrector O'NEILL ENTERPRISES INC �Wner PETER J/MEGAN H LANG Create Date 08/07/2013 Category q�2-Res-Interior(New/Relocated Fixtures) Plan Inspector Jerry Fabisch Bathtub 0 Clothes Wshr 0 Classrm Sink Shower 0 Surgeons Sink 0 Roof Drain 0 Lndry Tray 0 Exam Sink 0 Deduct Meters p Whiripool 0 Sum Pum 0 Sterilizer 0 Soda Disp 0 Wtr Sewer Mtrs P P 0 F Prep Sink 0 RPZ Valve � Lavatory 0 San Sum /Pum 0 Coffee Maker 0 Wtr Usage Mtrs _p p P 0 Flr/V1/st Sink 0 Bidet Toilet 0 Water Softner 0 Site Drain 1 Misc. � 1 Hand Sink 0 Urinal 0 Wait.St. � Fixtures Kit Sink 0 Standp Rec 0 Lab Sink Dis osal 0 Beer Tap 0 Ice Chest p p 0 Gar Drein 0 Plaster Sink Dishwasher 0 Dip Well 0 Comm Ice Maker p 0 Local Waste 0 Sculry Sink 0 Drink Ftn Floor Drain 0 Bar Sink 0 Int Grease Trap p 0 Serv Sink 0 Wash Ftn 0 Ext Grease Trap p Hose Bibb 2 Breakrm Sink 0 Sham Sink Water Heater p P 0 Catch Basin 0 Eye Wash Statn p Use/Nature SFR/additional fixtures added to permit#155336 — of Work � I I Size M -�I aterial Type # Conn.Type Sanitary Sewer Storm Sewer Water Service Parcel Id# Valuation $500.00 plan q 1521550000 pproval � pe��t Fees $36.00 ❑ Permit Voided� Issued By � Date 08/07/2013 In the performance of this work, I agree to pertorm all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. Signature Date AgenUOwner Address 522 W 6TH AVE OSHKOSH WI 54902 -5916 Telephone Number 920-230-2007 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing, Service, Final, etc.),Access into Building if Secure(how do we ain ent Number. Unless specified otherwise,we will assume the project is ready at the time the request is�ecei ed. Wo k may e continue if the inspection is not pertormed within two business days from the time the project is ready.