HomeMy WebLinkAbout0157100-Plumbing (addn to #155336) � CITY OF OSHKOSH
OSHKOSH No 157100
ON THE WATER PLUMBING PERMIT -APPLICATION AND RECORD
Job Address 2300 WHITE SWAN DR
Contrector O'NEILL ENTERPRISES INC �Wner PETER J/MEGAN H LANG
Create Date 08/07/2013
Category q�2-Res-Interior(New/Relocated Fixtures) Plan
Inspector Jerry Fabisch
Bathtub 0 Clothes Wshr 0 Classrm Sink
Shower 0 Surgeons Sink 0 Roof Drain
0 Lndry Tray 0 Exam Sink 0 Deduct Meters p
Whiripool 0 Sum Pum 0 Sterilizer 0 Soda Disp 0 Wtr Sewer Mtrs
P P 0 F Prep Sink 0 RPZ Valve �
Lavatory 0 San Sum /Pum 0 Coffee Maker 0 Wtr Usage Mtrs _p
p P 0 Flr/V1/st Sink 0 Bidet
Toilet 0 Water Softner 0 Site Drain 1 Misc. �
1 Hand Sink 0 Urinal 0 Wait.St. � Fixtures
Kit Sink 0 Standp Rec 0 Lab Sink
Dis osal 0 Beer Tap 0 Ice Chest p
p 0 Gar Drein 0 Plaster Sink
Dishwasher 0 Dip Well 0 Comm Ice Maker p
0 Local Waste 0 Sculry Sink 0 Drink Ftn
Floor Drain 0 Bar Sink 0 Int Grease Trap p
0 Serv Sink 0 Wash Ftn 0 Ext Grease Trap p
Hose Bibb 2 Breakrm Sink 0 Sham Sink
Water Heater p
P 0 Catch Basin 0 Eye Wash Statn p
Use/Nature SFR/additional fixtures added to permit#155336 —
of Work
�
I
I
Size M -�I
aterial Type # Conn.Type
Sanitary Sewer
Storm Sewer
Water Service
Parcel Id#
Valuation $500.00 plan q 1521550000
pproval � pe��t Fees $36.00 ❑ Permit Voided�
Issued By
�
Date 08/07/2013
In the performance of this work, I agree to pertorm all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the
easement holder(s)and to secure any necessary approvals before starting such activity.
Signature
Date
AgenUOwner
Address 522 W 6TH AVE OSHKOSH
WI 54902 -5916 Telephone Number 920-230-2007
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection(i.e. Footing, Service, Final, etc.),Access into Building if Secure(how do we ain ent
Number. Unless specified otherwise,we will assume the project is ready at the time the request is�ecei ed. Wo k may e
continue if the inspection is not pertormed within two business days from the time the project is ready.