Loading...
HomeMy WebLinkAbout0157148-Building (siding repairs) � CITY OF OSHKOSH No 157148 Z OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER : Job Address 1285 HERITAGE TRL Owner DENNIS E MCHUGH Create Date 07/29/2013 Designer Contractor VEARD HOME IMPROVEMENTS Inspector Nicole Krahn Category 042-Residential Siding Plan Type � Building � Sign � Canopy � Fence 0 Raze : Zoning R-1 Class of Const: Size Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection FinishedlLiving Sq.Ft. Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation � Poured Concrete 0 Floating Slab � Pier 0 Other � Concrete Block � Post � Treated Wood Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Not Required Park Dedication Not Required �t Dwelling Units 0 #Structures 0 Use/Nature FR(LATE PERMIT)/SIDING REPAIRS ON THE HOUSE DUE TO HAIL DAMAGE-NO STRUCTURAL CHANGES of Work i i i � HVAC Contractor Plumbing CoMractor Electric Contractor Fees: Valuation $ ,400.00 Plan Approval $0.00 Permit Fee Paid $151.00 Park Dedication $0.00 Issued By: ��� Date 08/09/2013 Final/O.R 00/00/0000 ❑ Permit Voided I Parcel Id# 1314740000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. I have read and un sta the afore mentioned i formation. Signature �� (J� Date og-r AgenUOwner Address 1828 OREGON ST ___OSHKOSH WI 54902_ - 6965 Telephone Number (920)410-4853 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.