Loading...
HomeMy WebLinkAbout0104235 BOSHKOSH ON THE WATER .lob Address 2127 2129 JACKSON ST Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner JACKSON STREET DEVELOPMENT LLC Contractor R J ALBRIGHT INC. Category 223 - Alteration Offices, Banks, Professional No 104235 Create Date 09/05/2003 Plan Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~ Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation (~ Poured Concrete (~ Floating Slab (~ Pier (~ Other (~ Concrete Block (~ Post (~ Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature 2129 Jackson/Interior alterations. Remove partition walls in NE area of office suite. Install new flooring through out the suite. of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $20,000.00 Plan Approval $0.00 Permit Fee Paid $95.00 Park Dedication $0.00 Date 09/17/2003 Final/O.P. 00/00/0000 Permit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 5711 GREEN VALLEY RD OSHKOSH WI 54904 - 0000 Telephone Number 231-8635 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. OSHKOSH ON THE WATER Job Address 2127 2129 JACKSON ST CITY OF OSHKOSH No '104235 BUILDING PERMIT - APPLICATION AND RECORD Owner JACKSON STREET DEVELOPMENT LLC Create Date 09/05/2003 Designer Category Contractor R J ALBRIGHT INC. 223 -Alteration Offices, Banks, Professional Plan Type · Building Zoning Class of Const: Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Garage 0 Sq. Ft. Baths 0 Foundation ~) Poured Concrete (~) Floating Slab (~ Pier · Other O Concrete Block (~ Post (~ Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 (~Sign O Canopy (~ Fence (~Raze I Size [] ProjeCtion j Canopies 0 Signs 0 Use/Nature 2129 Jackson/Intedor alterations. Remove partition walls in NE area of office suite. Install new flooring through out the suite. of Work HVAC Contractor Electric Contractor Fees: Valuat~ Issued By: _~ $20,000.00 Plan Approval Plumbing Contractor $0.00 Permit Fee Paid $95.00 Park Dedication $0.00 Date 09/17/2003 Final/O.P. 00/00/0000 [] Permit Voideda In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enfome easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to~ ar~ neces~c~r~starting such activity. Signature "' ~ ~.~_/J/' ' ' '-]'-'-/'~"~'~'J"~L-'~- Date Agent/Owner Address 5711 GREEN VALLEY RD OSHKOSH WI 54904 - 0000 Telephone Number 231-8635 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.