Loading...
HomeMy WebLinkAbout0157593-Building (roof) � CITY OF OSHKOSH No 157593 � OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 446 BOWEN ST Owner PAUL R GETCHEL Create Date 08/20/2013 Designer Contractor DUNRITE CONSTRUCTION Inspector Andrew Prickett Category 041 -Residential Roofing Plan Type � Building 0 Sign � Canopy � Fence � Raze Zoning R-2 Class of Const: Size Unfinished/Basement Sq.Ft. Rooms _ Height Ft. ❑ Projection ; Finished/Living Sq.Ft. Bedrooms Stories Canopies Garage Sq.Ft. Baths __ Signs Foundation � Poured Concrete � Floating Slab � Pier � Other � Concrete Block � Post � Treated Wood — Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication #Dweiling Units 0 #Structures 0 Use/Nature SFR/Late permit/Re-roof' ?'ear off and replace shingles. No structural work. of Work i � - ___ � HVAC Contra I tor Plumbing Contractor -- Electric Contractor Fees: Valuation $6,000.00 Plan Approval $0.00 Permit Fee Paid $72.00 Park Dedication $0.00 Issued By: Date 09/O6/2013 Final/O.P. 00l00/0000 ❑ Permit Voided j Parcel Id# 1100590000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. I have read and understan. f re mention information. ry� Signature �.- �/l� Date �p �� AgenUOwner Address Oshkosh WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.