SEPTEMBER 10, 2013 13-418 RESOLUTION
(CARRIED___6-0____ LOST _______ LAID OVER _______ WITHDRAWN _______)
PURPOSE: APPROVAL OF CHANGE ORDER NO. 1 FOR PUBLIC WORKS
CONTRACT NO. 13-06 WITH AL DIX CONCRETE, INC. FOR
CONCRETE SIDEWALK – NEW AND RECONSTRUCTION
(+$152,584.76)
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh that the following
Change Order, a copy of which is attached, is hereby approved:
AL DIX CONCRETE, INC.
500 Draper Street
Kaukauna, WI 54130
Net Increase to contract: $152.584.76
PURPOSE: See attached Change Order.
BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated
from:
Acct. No. 311-0410-7480-00000 Sidewalk Construction Fund
315-0410-7480-00000 Streets Improvement Fund
317-0410-7480-03304 Special Assessments Fund – Sidewalks
541-1867-6401-08673 Water Utility – Maintenance of Mains
541-1867-6401-08675 Water Utility – Maintenance of Services
CADY
OI-KOfH
ON THE WATER MEMORANDUM
TO: Honorable Mayor and Members of the Common Council
FROM: Steven M. Gohde, Assistant Director of Public Works 51446 /i e
DATE: September 5, 2013
RE: Change Order No. 1 for Public Works Contract No. 13-06 Concrete Sidewalk
Al Dix Concrete (+$152,584.76)
BACKGROUND
Change Order No. 1 for Contract 13-06 is scheduled for consideration by the Common Council at the
September 10, 2013 meeting. The contract was originally awarded to Al Dix Concrete in March of 2013. This
change order is for additional services provided.
ANALYSIS
Following is a summary of the significant changes to each section of the CIP and the operating budget:
• CIP-Sidewalk — The results of a claim forced the City to being correcting defective driveway
approaches. The scope of work involved was not known at the time of bidding. The result was a large
overage in Bid Items #1510 and #1906. The landscaping was inadvertently forgotten in the bid for the
ordered-in sidewalk on South Koeller Street, causing large overages in Bid Items #1370 and #2932.
These costs will be billed to the abutting property owners.
• Water Utility Operating/Street Patch — The bid quantities for Bid Items #1318, #1502, and #1512 were
incorrectly entered into the proposal by City Staff. The actual quantities installed are actually only a
slight increase of the work that was done the previous years.
• CIP-Street — Additional concrete work was completed in the Rivermill Subdivision area in conjunction
with the relocation of a Wisconsin Public Service gas main to correct some defective pavement. The
City is responsible for this additional pavement repair.
FISCAL IMPACT
Funding for the project is in the 2013 Capital Improvement Program Sidewalk Section and in the Water Utility
Operating Budget. The additional services provided for the Sidewalk Section of the CIP will be billed to the
adjoining property owner's per the Municipal Code. Street section funding is available from street reconstruction
projects coming in under budget.
Budget Section Funding Change Order Amount New Contract Total
CIP -Sidewalk $350,000.00 $59,660.86 $363,204.36
Water Utility Operating/
Street Patch (See Note) $108,833.94 $88,898.94 $108,833.94
CIP-Street $4,024.96 $4,024.96 $4,024.96
Total $462,858.90 $152,584.76 $476,063.26
Note: Water Utility Operating Budget contains $774,000 for maintenance of mains and services. The
$108,833.94 needed for repairing concrete pavement is part of this maintenance budget.
RECOMMENDATIONS
I recommend approval of Change Order No. 1 to Contact No. 13-06 in the amount of +$152,584.76 to Al Dix
Concrete.
Approved:
Mark A. Rohloff
City Manager
SMG/tIt
1.1Engineering113-06 Conc Sidewalk(New&Rehab)\Project_Information lCorrespondence\Memo113-06 CO#1 Memo_9-5-13.docx
TO: Al Dix Concrete CHANGE ORDER#1
500 Draper Street DATED: August 21, 2013
Kaukauna, WI 54130
Your present contract with the City of Oshkosh, Contract No.13-06, awarded March 26, 2013, is hereby
amended and changed as follows:
NET INCREASE TO: SECTION I - PAVING 146,600.27
NET INCREASE TO: SECTION II - STORM SEWER 5,984.49
NET INCREASE TO CONTRACT $152,584.76
Section I Section II Section III Section IV
(Paving) (Storm) (Sanitary) (Water) Totals
Bid Total $322,828.50 $650.00 $0.00 $0.00 $323,478.50
C.O. #1 $146,600.27 $5,984.49 $152,584.76
Contract Total $469,428.77 $6,634.49 $0.00 $0.00 $476,063.26
CITY OF OSHKOSH
BY:
Recommended: City Manager
Director of Public Works City Clerk
Approved and accepted:
1/4/t. 04, -
a.....----
Contractor
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin,
under the within Change Order.
Comptroller
Approved as to form:
City Attorney
CONTRACT: 13-06 CHANGE ORDER#1
SECTION I-PAVING
ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT
PRICE PRICE
1308 7"concrete pavement
removal and replacement,
including sawing,
pavement ties, integral
curb and grading,
terracing, and traffic
control,complete as Square
specified Yards 270 293.58 23.58 $43.00 $1,013.94
1318 8"concrete pavement
removal and replacement,
including sawing,
pavement ties, integral
curb and grading,
terracing, and traffic
control,complete as Square
specified Yards 40 850.00 810.00 $45.00 $36,450.00
1360 Adjust manholes and
inlets,complete as
specified Each 2 9.00 7.00 $200.00 $1,400.00
1370 Terrace work,complete as Square
specified Yards 200 4,089.66 3,889.66 $4.00 $15,558.64
1502 4"concrete sidewalk with
3"CABC and grading,
water department
locations,complete as Square
specified Feet 500 6,500.00 6,000.00 $6.00 $36,000.00
1510 6"concrete sidewalk,
driveway,or ramp with 3"
CABC and grading, Square
complete as specified Feet 700 1,100.00 400.00 $3.95 $1,580.00
1512 6"concrete sidewalk,
driveway,or ramp with 3"
CABC and grading,water
department locations, Square
complete as specified Feet 50 2,500.00 2,450.00 $6.30 $15,435.00
1550 No.4 reinforcing rods,
deformed,epoxy-coated, Linear
complete as specified Feet 500 1,609.00 1,109.00 $0.75 $831.75
1800 Base aggregate dense,%",
complete as specified Tons 150 314.27 164.27 $12.00 $1,971.24
1906 4"asphaltic pavement with
10"CABC and grading, Square
complete as specified Yards 75 1,200.00 1,125.00 $30.00 $33,750.00
SECTION I-(BID ITEMS 1110-1906)-SUB-TOTALS $143,990.57 $0.00
Page 1 of 2
ADDITIONAL WORK: C.O.#1 -(ITEM 10000)-SUB-TOTAL $2,609.70 $0.00
NET INCREASE TO: SECTION I $146,600.27
CONTRACT: 13-06 CHANGE ORDER#1
ADDITIONAL WORK REQUIRED: C.O.#1 -SECTION I
ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT CONTRACT CONTRACT
QUANTITY QUANTITIES INCREASE DECREASE PRICE
PRICE PRICE
10000 Additional cost to hire Sub-
Contractor to pave asphalt
patches with a paver,due
to large increase in
quantity,complete as Square
specified Yards 0.00 521.94 521.94 $5.00 $2,609.70
ADDITIONAL WORK: C.O.#1 -(ITEM 10000)-SUB-TOTAL $2,609.70 $0.00
NET INCREASE TO: SECTION I $146,600.27
SECTION II-STORM SEWER
ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT CONTRACT CONTRACT
QUANTITY QUANTITIES INCREASE DECREASE PRICE
PRICE PRICE
2932 Furnish and install Class I,
Urban,Type A erosion
control mat,complete as Square
specified Yards 100 4,089.66 3,989.66 $1.50 $5,984.49
SECTION II-(BID ITEMS 2856&2932)-SUB-TOTALS $5,984.49 $0.00
NET INCREASE TO: SECTION II $5,984.49
NET INCREASE TO SECTIONS I&II $152,584.76
NET DECREASE TO SECTIONS I&II $0.00
NET INCREASE TO CONTRACT: $152,584.76