HomeMy WebLinkAbout0157568-Building (driveway) 5
� CITY OF OSHKOSH No �575ss
OSHKOSH COMMERCIAL BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 1545 ARBORETUM DR Create Date 08/29/2013
Project Parking and driveway Project Number 0
Owner ASSOCIATION RIVER MILL CONDO Plan
Contractor NORTHEASTASPHALT INC
Inspector Nicole Krahn
Designer Martinson&Eisle
Category 257-Commercial Parking Lot/Driveway Type of Plan
Zoning Square Footage
Major Occ Const Class
Fire Protection 0 Sprinkled � Unsprinkled � Sprinkler Design
Occupancy Permit Flood Plain Height Permit .
Park Dedication #Dwelling Units 0 #Structures 0
� Projection ; Canopies Signs
Use/Nature
of Work
COMM\Remove&replace 1600 sq.ft.of 3"asphalt, install downspout and route to sewer,excavate8�replace 15"on approach(600 sq.ft.)See
attached site plan and approval **check#32262,32263
I
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $71,233.00 Plan Approval $25.00 Permit Fee Paid $642.00 Park Dedication $0.00
issued By: ��/ ► + � Date 09/05/2013 Final/O.P. 00/00/0000
� Permit Voided I Parcel Id# 1200030000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to secure any necessary approvals before starting such activity.
I have read and understand the afore ti i n.
Signature —�'" J Date � Sr �3
AgenUOwner
Address W6380 DESIGN DR GREENVILLE WI 54942 - 0000 Telephone Number 920-757-2900
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.