Loading...
HomeMy WebLinkAbout0157568-Building (driveway) 5 � CITY OF OSHKOSH No �575ss OSHKOSH COMMERCIAL BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 1545 ARBORETUM DR Create Date 08/29/2013 Project Parking and driveway Project Number 0 Owner ASSOCIATION RIVER MILL CONDO Plan Contractor NORTHEASTASPHALT INC Inspector Nicole Krahn Designer Martinson&Eisle Category 257-Commercial Parking Lot/Driveway Type of Plan Zoning Square Footage Major Occ Const Class Fire Protection 0 Sprinkled � Unsprinkled � Sprinkler Design Occupancy Permit Flood Plain Height Permit . Park Dedication #Dwelling Units 0 #Structures 0 � Projection ; Canopies Signs Use/Nature of Work COMM\Remove&replace 1600 sq.ft.of 3"asphalt, install downspout and route to sewer,excavate8�replace 15"on approach(600 sq.ft.)See attached site plan and approval **check#32262,32263 I HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $71,233.00 Plan Approval $25.00 Permit Fee Paid $642.00 Park Dedication $0.00 issued By: ��/ ► + � Date 09/05/2013 Final/O.P. 00/00/0000 � Permit Voided I Parcel Id# 1200030000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. I have read and understand the afore ti i n. Signature —�'" J Date � Sr �3 AgenUOwner Address W6380 DESIGN DR GREENVILLE WI 54942 - 0000 Telephone Number 920-757-2900 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.