Loading...
HomeMy WebLinkAbout0156920-Plumbing (cap lateral) � CITY OF OSHKOSH No 156920 OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 1675 OHIO ST Owner 1675 OHIO STREET LLC Create Date 07/26/2013 Contractor WALTER R SCHMID JR Category 401 -Residential-Exterior(laterals) Pian Inspector Jerry Fabisch Bathtub 0 Clothes Wshr 0 Classrm Sink 0 Surgeons Sink 0 Roof Drain 0 Deduct Meters 0 Shower 0 Lndry Tray 0 Exam Sink 0 Sterilizer 0 Soda Disp 0 Wtr Sewer Mtrs 0 Whirlpool 0 Sump Pump 0 F Prep Sink 0 RPZ Valve 0 Coffee Maker 0 Wtr Usage Mtrs 0 Lavatory 0 San Sump/Pump 0 FINWst Sink 0 Bidet 0 Site Drain 0 Misc. p Toilet 0 Water Softner 0 Hand Sink 0 Urinal 0 Wait.St. � Fixtures Kit Sink 0 Standp Rec 0 Lab Sink 0 Beer Tap 0 Ice Chest 0 Disposal 0 Gar Drain 0 Plaster Sink 0 Dip Well 0 Comm Ice Maker 0 Dishwasher 0 Local Waste Floor Drain 0 Bar Sink 0 Serv Sink _ 0 Wash Ftn 0 Ext Grease Trap 0 Hose Bibb 0 Breakrm Sink 0 Shamp Sink 0 Catch Basin 0 Eye Wash Statn 0 Water Heater 0 Use/Nature Duplex/Cap lateral*prior to razing the building. of Work Size Material Type # Conn.Type Sanitary Sewer Storm Sewer Water Service Parcel Id# 1302210000 Valuation $5,400.00 Plan Approval $0.00 Permit Fees $30.00 ❑ Permit Voided I Issued By Date 07/26/2013 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to se re any neces ry ap rovals be r starting such activity. Signature � Date � � ��^�� AgenUOwn r Address 7821 SWISS RD Oshkosh WI 54902 -0000 Telephone Number 688-2496 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.