HomeMy WebLinkAbout0157380-Building (garage repairs) � CITY OF OSHKOSH No 157380
�
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 1357 OTTER AVE Owner KAIVEL A KRONZER Create Date OS/22/2013
Designer Contractor KRIER'S CONSTRUCTION
Inspector John Zarate
Category 152-Residential Addn/Alt Accessory Structure Plan
Type � Building � Sign � Canopy � Fence � Raze j
Zoning R-2 Class of Const: Size
Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection ;
Finished/Living Sq.Ft. Bedrooms Stories Canopies
Garage Sq.Ft. Baths Signs
Foundation � Poured Concrete � Floating Slab � Pier � Other
� Concrete Block � Post � Treated Wood
Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit
Park Dedication #Dwelling Units 0 #Structures 0
Use/Nature SFR/ Garage repairs'to include installing 20'of grade beam and bottom plate and replacing the existing roofing.
of Work
I
�
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $4,000.00 Plan Approval $0.00 Permit Fee Paid $58.00 Park Dedication $0.00
issued By: Date 08/22/2013 Final/O.P. 00/00/0000
❑ Permit Voided I Parcel Id#0802980000
In the performance this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to secure any necessary approvals before starting such activity.
I have read and understand the a�f e mentioned information.
Signature )� ��, G�`'7/ Date �G' �-�� �
AgenUOwner :
Address PO BOX 3424 OSHKOSH WI 54903 - 3424 Telephone Number (920)685-2333
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.