HomeMy WebLinkAbout0157477-Building (wall sign) � CITY OF OSHKOSH No �5�4��
�
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 900 906 W 9TH AVE Owner RAY REINDERS Create Date 08/19/2013
Designer Jeff Liddle Contractor FLYWAY INC
Inspector Nicole Krahn
Category 254-Signs Plan
Type � Building � Sign � Canopy � Fence � Raze I
Zoning R-2 Class of Const: Size
Unfinished/Basement Sq.Ft. Rooms _ Height Ft. ❑ Projection 'i
Finished/Living Sq.Ft. Bedrooms Stories Canopies
Garage Sq.Ft. Baths Signs
Foundation � Poured Concrete � Floating Slab 0 Pier � Other
� Concrete Block � Post � Treated Wood
Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Not Required
Park Dedication Not Required #Dwelling Units 0 #Structures 0
Use/Nature Commercial--install s/f wall sign on south elevation for"Link Computing Solutions"per plan. {UL#'S 947782-947788} '"check 18584
of Work
HVAC Contractor Plumbing Contractor .
Electric Contractor
Fees: Valuation $5,700.00 Plan Approval $0.00 Permit Fee Paid $97.00 Park Dedication $0.00
Issued By:�� Date OS/29/2013 Final/O.P. 00/00/0000
� Permit Voided I Parcel Id#0605810000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perForm the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to secure any necessary approvals before starting such activity.
I have read and erstan the afore men' d information.
Signature Date �v?�� :
AgenUOwner
Address N5528 MIRANDA WAY FOND DU LAC WI 54937 - 9105 Telephone Number 920-921-7181
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.