HomeMy WebLinkAbout0157453-Building (front porch patio) � CITY OF OSHKOSH No 157453
�
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 2017 MENOMINEE DR Owner STANLEY G/LYNNE K LEEDLE Create Date OS/28/2013
Designer Contractor ANDERSON BROS INC
Inspector
Category 044-Residential Patios Plan
Type � Building 0 Sign � Canopy 0 Fence � Raze I
Zoning R-1 Class of Const: Size
Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection j `
Finished/Living Sq.Ft. Bedrooms Stories Canopies
Garage Sq.Ft. Baths Signs
Foundation � Poured Concrete 0 Floating Slab � Pier � Other
� Concrete Block � Post � Treated Wood
Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit
Park Dedication #Dwelling Units 0 #Structures 0
Use/Nature ;SFR/Front porch patio'Constructing 3.5'x 14.5'proch addition on front of the house.
of Work
HVAC Contractor Plumbing Contractor
Electric Contrector
Fees: Valuation $2,500.00 Plan Approval $0.00 Permit Fee Paid $82.00 Park Dedication $0.00
Issued By: Date 08/28/2013 Final/O.P. 00/00/0000 '
� Permit Voided��� Parcel Id# 1512140000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to secure any necessary approvals before starting such activity.
I have read and unders the afor menti rmation.
Signature 1�('���c�_ Date � a�8��
AgenUOwner
Address 2222 WHITE SWAN DR OSHKOSH WI 54901 - 2567 Telephone Number 920-233-4286
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Uniess specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.