Loading...
HomeMy WebLinkAbout0157454-Building (roof) � CITY OF OSHKOSH No 157454 � OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 2655 MONTCLAIR PL Owner KEITH A SPARR Create Date 08/26/2013 Designer Contractor MICHAEL P BERNIER Inspector John Zarate Category 041 -Residential Roofing Plan Type � Building � Sign � Canopy � Fence � Raze J Zoning R-1 Class of Const: Size Unfinished/Basement Sq.Ft. Rooms Height Ft. � Projection '� Finished/Living Sq.Ft. Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation � Poured Concrete � Floating Slab � Pier � Other � Concrete Block � Post � Treated Wood -- _ Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 Use/Nature ,SFR/tear off and re-roof house and garage of Work i I — HVAC Contractor _ Plumbing Contractor Electric Contractor Fees: Valuation _ $8,000.00 Plan Approval _ $0.00 Permit Fee Paid $86.00 Park Dedication $0.00 Issued By: �� Date 08/28/2013 Final/O.P. 00/00/0000 ❑ Permit Voided'i Parcel Id# 1319240000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. I have read and un st e afore�rn�ntion�ation. /� Signature � C �7CGz� Date ���'�� . AgenUOwner Address 1108 PIERCE AVE OSHKOSH WI 54902 - 3454 Telephone Number 233-3438 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.