Loading...
HomeMy WebLinkAbout0157459-Plumbing � CITY OF OSHKOSH No 157459 OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 505 519 KNAPP ST Owner ST JUDE THE APOSTLE PARISH CORP Create Date 08/28/2013 Contractor O'NEILL ENTERPRISES INC Category 442-Commercial-Interior(New/Relocated Fixt� Plan Inspector Jerry Fabisch Bathtub 0 Clothes Wshr 0 Classrm Sink 0 Surgeons Sink 0 Roof Drain 0 Deduct Meters 0 Shower Whirlpool 0 Sump Pump 0 F Prep Sink 0 RPZ Valve 0 Coffee Maker 0 Wtr Usage Mtrs 0 Lavatory 4 San Sump/Pump 0 FIr/Wst Sink 0 Bidet 0 Site Drain 0 Misc. p Toilet Kit Sink 0 Standp Rec 0 Lab Sink 0 Beer Tap 0 Ice Chest 0 Disposal 0 Gar Drain 0 Plaster Sink 0 Dip Well 0 Comm Ice Maker 0 Dishwasher 0 Local Waste 0 Sculry Sink 1 Drink Ftn 1 Int Grease Trap 1 Floor Drain 0 Bar Sink 0 Serv Sink 0 Wash Ftn 0 Ext Grease Trap 0 Hose Bibb 0 Breakrm Sink 0 Shamp Sink 0 Catch Basin 0 Eye Wash Statn 0 Water Heater 0 Use/Nature COMM/interior plumbing associated with the remodel of bathroom and kitchen area of Work � i I Size Materiai Type # Conn.Type Sanitary Sewer Storm Sewer Water Service Parcel Id# 0606630000 Valuation $15,000.00 Plan Approval $0.00 Permit Fees $126.00 ❑ Permit Voided I Issued By �� Date 08/28/2013 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. Signature Date AgenUOwner Address 522 W 6TH AVE OSHKOSH WI 54902 -5916 Telephone Number 920-230-2007 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.