Loading...
HomeMy WebLinkAbout0157308-Plumbing (water heater) � CITY OF OSHKOSH No 157308 OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 667 FREDERICK ST Owner TRI STAR INVESTMENTS II LLC Create Date 06/28/2013 Contractor QUANDT PLUMBING LLC Category 411 -Residential-Water Heaters Plan Inspector Bathtub 0 Clothes Wshr 0 Classrm Sink 0 Surgeons Sink 0 Roof Drain 0 Deduct Meters 0 Shower 0 Lndry Tray 0 Exam Sink 0 Sterilizer 0 Soda Disp 0 Wtr Sewer Mtrs 0 Whirlpool 0 Sump Pump 0 F Prep Sink 0 RPZ Valve 0 Coffee Maker 0 Wtr Usage Mtrs 0 Lavatory 0 San Sump/Pump 0 FldWst Sink 0 Bidet 0 Site Drain 0 Misc. p Toilet 0 Water Softner 0 Hand Sink 0 Urinal 0 Wait.St. � Fixtures Kit Sink 0 Standp Rec 0 Lab Sink 0 Beer Tap 0 Ice Chest 0 Disposal 0 Gar Drain 0 Plaster Sink 0 Dip Well 0 Comm Ice Maker 0 Dishwasher 0 Local Waste 0 Sculry Sink _ 0 Drink Ftn 0 Int Grease Trap 0 Floor Drain 0 Bar Sink 0 Serv Sink 0 Wash Ftn 0 Ext Grease Trap 0 Hose Bibb 0 Breakrm Sink 0 Shamp Sink 0 Catch Basin 0 Eye Wash Statn 0 Water Heater 1 Use/Nature SFR/install water heater of Work **ck#5113** Size Material Type # Conn.Type Sanitary Sewer Storm Sewer Water Service Parcel Id# 0704310000 Valuation $500.00 Plan Approval $0.00 Permit Fees $9.00 ❑ Permit Voided'� Issued By Date 08/20/2013 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)an cure any ne Is before starting such activity. Signature �— Date � 2� '-�� : AgenUOwner Address 1010 WYLDE OAK DR OSHKOSH WI 54904 -7635 Telephone Number 920-420-5185 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.