HomeMy WebLinkAbout0156780-Building (siding) � CITY OF OSHKOSH No 156780
�
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 507 W 6TH AVE Owner DENNIS L RYCKMAN Create Date 07/18/2013
Designer Contractor XACT RESTORATION AND REMODELING
Inspector Nicole Krahn
Category 042-Residential Siding Plan
Type � Building � Sign � Canopy � Fence � Raze JI
Zoning R-2 _ Class of Const: Size
Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection '�
Finished/Living Sq.Ft. Bedrooms Stories Canopies
Garage Sq.Ft. Baths _ _ Signs
Foundation � Poured Concrete � Floating Slab � Pier � Other
� Concrete Block 0 Post � Treated Wood
Occupancy Permit __ Occupancy Fee $0.00 Flood Plain Height Permit
Park Dedication #Dwelling Units 0 #Structures 0
Use/Nature �SFR/r d niise g oh use/finishing the siding started by another contractor
of Work
I
, �
---- - — --
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $4,000.00 Plan Approval $0.00 Pertnit Fee Paid $58.00 Park Dedication $0.00
Issued By: <���^ Date 07/18/2013 Final/O.P. 00/00l0000
❑ PermitVoided Parcelld#0600630000
in the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit appli within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to secure a ne sary approvals before starting such activity.
I have read and understand ore ioned information.
Signature Date �-�� -/ �
AgenUOwner
Address 2905 UNIVERSAL DR STE LL6 OSHKOSH WI 54904 - 0000 Telephone Number (920)915-6798
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.