Loading...
HomeMy WebLinkAbout0156780-Building (siding) � CITY OF OSHKOSH No 156780 � OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 507 W 6TH AVE Owner DENNIS L RYCKMAN Create Date 07/18/2013 Designer Contractor XACT RESTORATION AND REMODELING Inspector Nicole Krahn Category 042-Residential Siding Plan Type � Building � Sign � Canopy � Fence � Raze JI Zoning R-2 _ Class of Const: Size Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection '� Finished/Living Sq.Ft. Bedrooms Stories Canopies Garage Sq.Ft. Baths _ _ Signs Foundation � Poured Concrete � Floating Slab � Pier � Other � Concrete Block 0 Post � Treated Wood Occupancy Permit __ Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 Use/Nature �SFR/r d niise g oh use/finishing the siding started by another contractor of Work I , � ---- - — -- HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $4,000.00 Plan Approval $0.00 Pertnit Fee Paid $58.00 Park Dedication $0.00 Issued By: <���^ Date 07/18/2013 Final/O.P. 00/00l0000 ❑ PermitVoided Parcelld#0600630000 in the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit appli within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure a ne sary approvals before starting such activity. I have read and understand ore ioned information. Signature Date �-�� -/ � AgenUOwner Address 2905 UNIVERSAL DR STE LL6 OSHKOSH WI 54904 - 0000 Telephone Number (920)915-6798 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.