Loading...
HomeMy WebLinkAbout0156749-Building (roof) i > f � CITY OF OSHKOSH No 156749 � � ; OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 515 W BENT AVE Owner JONATHAN T KAUFMANN Create Date 07/11/2013 Designer Contractor HOMESTEAD BUILDERS LLC Inspector John Zarate Category 041 -Residential Roofing p�a� t Type � Building � Sign 0 Canopy � Fence 0 Raze 2oning R-2 Class of Const: Size Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection Finished/Living Sq.Ft. Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation � Poured Concrete � Floating Slab � Pier � Other 3 � Concrete Block � Post 0 Treated Wood Occupancy Permit Not Required Occupancy Fee _ $0.00 Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 Use/Nature SFR/LATE PERMIT/Re-roofed the house(complete tear off, no structural work). of Work � � HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $9,000.00 Plan Approval $0.00 Permit Fee Paid $193.00 Park Dedication $0.00 Issued By: ;�— Date 07/17/2013 Final/O.P. 00/00/0000 ❑ Permit Voided j Parcel Id# 1208930000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. I have read an derst�rcythe afore n' ation. Signature � Date ?��( —� AgenUOwner 4 Address 5669 ANGLE RD OSHKOSH WI 54904 - 6855 Telephone Number 920-410-5117 i To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection (i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.