HomeMy WebLinkAbout0104217-Plumbing (abandon well)OSHKOSH
ON THE WATER
Job Address 2310 W WAUKAU AVE
Contra~or FARMERS SUPPLY CO
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner JOHN FRINGS
Category 410- Residential-Interior
Bathtub 0 Shower 0 Ejector/Grind 0 Dip Well 0 F Prep Sink
Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink
Lavatory 0 Lndry Tray 0 Local Waste 0 Wait. St. 0 Shamp Sink
Toilet 0 Lndry Stndp 0 Clothes Wshr 0 Ice Chest 0 FIr/~Nst Sink __
Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin
BarS]nk 0 Dishwasher 0 BeerTap 0 SculrySink 0 Wash Ftn
Water Heater 0 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal
Site Drain 0 Classrm Sink 0 LabSink 0 Plaster Sink 0 Standp Rec
Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker
No 104217
Create Date 09/16/2003
Plan
0 Gar Drain 0
0 Soda Disp 0
0 Coffee Maker 0
0 tht Grease Trap 0
0 Ext Grease Trap 0
0 RPZ Valve 0
0 EyeWash Statn 0
0
0
Use/Nature
of Work
ABANDON PRIVATE WELL & CONNECT TO CITY WATER
Sani~rySewer
Storm Sewer
Water Service
Size Material Type #
Conn. Type
0
0
0
0
0
0
0
Valuation $400.00 Plan Approval $0.00 Permit Fees $20.00 [] PermitVoided]
Issued By
Date 09/16/2003
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enfome easement restrictions of which it is not a party, if you pedorm the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary appr~re starting such acavity.
Signature '"~.-~ ~_~ ~ ~,~.,,~ ~ Date
^gen~Owner
Address 34 W 7TH AVE OSHKOSH WI 54902 - 0000 Telephone Number
235-697O
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.