Loading...
HomeMy WebLinkAbout0104217-Plumbing (abandon well)OSHKOSH ON THE WATER Job Address 2310 W WAUKAU AVE Contra~or FARMERS SUPPLY CO CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner JOHN FRINGS Category 410- Residential-Interior Bathtub 0 Shower 0 Ejector/Grind 0 Dip Well 0 F Prep Sink Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink Lavatory 0 Lndry Tray 0 Local Waste 0 Wait. St. 0 Shamp Sink Toilet 0 Lndry Stndp 0 Clothes Wshr 0 Ice Chest 0 FIr/~Nst Sink __ Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin BarS]nk 0 Dishwasher 0 BeerTap 0 SculrySink 0 Wash Ftn Water Heater 0 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal Site Drain 0 Classrm Sink 0 LabSink 0 Plaster Sink 0 Standp Rec Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker No 104217 Create Date 09/16/2003 Plan 0 Gar Drain 0 0 Soda Disp 0 0 Coffee Maker 0 0 tht Grease Trap 0 0 Ext Grease Trap 0 0 RPZ Valve 0 0 EyeWash Statn 0 0 0 Use/Nature of Work ABANDON PRIVATE WELL & CONNECT TO CITY WATER Sani~rySewer Storm Sewer Water Service Size Material Type # Conn. Type 0 0 0 0 0 0 0 Valuation $400.00 Plan Approval $0.00 Permit Fees $20.00 [] PermitVoided] Issued By Date 09/16/2003 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enfome easement restrictions of which it is not a party, if you pedorm the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary appr~re starting such acavity. Signature '"~.-~ ~_~ ~ ~,~.,,~ ~ Date ^gen~Owner Address 34 W 7TH AVE OSHKOSH WI 54902 - 0000 Telephone Number 235-697O To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.