HomeMy WebLinkAbout0104186-Building (egress window)OSHKOSH
ON THE WATER
,Job Address 424 N EAGLE ST
Designer
Category '141 - Exterior Remodeling
Type · Building (~ Sign
CITY OF OSHKOSH
BUILDING PERMIT -APPLICATION AND RECORD
Owner ADAM M/KARl L MESZAROS Create Date
Contractor TOM WILLIAMS BUILDING CONTRACTOR
Plan
(~) Canopy (~) Fence (~ Raze
No 104186
09/1612003
Zoning Class of Const:
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft.
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories
Garage 0 Sq. Ft. Baths 0
Foundation · Poured Concrete (~ Floating Slab (~) Pier (~ Other
O Concrete Block (~ Post (~) Treated Wood
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures
Size
[] Projection
Canopies 0
Signs 0
Use/Nature
of Work
SFPJ Installing an egress window and escape well. All construction shall comply with local and state building code requirements.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
$3,500.00 Plan Approval
Plumbing Contractor
$0.00 Permit Fee Paid $35.00 Park Dedication $0.00
Date 09/16/2003 Final/O.P. 00/00/0000
[] Permit Voidedi
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any nece&,~-~aCCfo~vals before startine such activity.
/ ~- . ~ ~ - Ag~-en-.~wner
Address~, 501 IOWA STREET OSHKOSH WI 54902 - 0000 Telephone Number 233-7817
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.