Loading...
HomeMy WebLinkAbout0104186-Building (egress window)OSHKOSH ON THE WATER ,Job Address 424 N EAGLE ST Designer Category '141 - Exterior Remodeling Type · Building (~ Sign CITY OF OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD Owner ADAM M/KARl L MESZAROS Create Date Contractor TOM WILLIAMS BUILDING CONTRACTOR Plan (~) Canopy (~) Fence (~ Raze No 104186 09/1612003 Zoning Class of Const: Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Garage 0 Sq. Ft. Baths 0 Foundation · Poured Concrete (~ Floating Slab (~) Pier (~ Other O Concrete Block (~ Post (~) Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures Size [] Projection Canopies 0 Signs 0 Use/Nature of Work SFPJ Installing an egress window and escape well. All construction shall comply with local and state building code requirements. HVAC Contractor Electric Contractor Fees: Valuation Issued By: $3,500.00 Plan Approval Plumbing Contractor $0.00 Permit Fee Paid $35.00 Park Dedication $0.00 Date 09/16/2003 Final/O.P. 00/00/0000 [] Permit Voidedi In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any nece&,~-~aCCfo~vals before startine such activity.  / ~- . ~ ~ - Ag~-en-.~wner Address~, 501 IOWA STREET OSHKOSH WI 54902 - 0000 Telephone Number 233-7817 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.