HomeMy WebLinkAbout0104100-Building (roof/overhead door)OSHKOSH
ON THE WATER
,lob Address 1015 CHERRY ST
Designer
Category
Type · Building
Zoning
Unfinished/Basement
Finished/Living
Garage
141 - Exterior Remodeling
Foundation
Occupancy Permit
Park Dedication
Use/Nature
of Work
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner ELIZABETH M NIEMUTH
Contractor OWNER
No 104100
Create Date 09/11/2003
Plan
Sign (~) Canopy ~ Fence ~ Raze
Class of Const: Size
0 Sq. Ft. Rooms 0 Height 0 Ft. [] Projection
0 Sq. Ft. Bedrooms 0 Stories Canopies __
0 Sq. Ft. Baths 0 Signs
· Poured Concrete (~ Floating Slab O Pier (~ Other
(~) Concmta Block (~ Post {~ Treated Wood
Flood Plain Height Permit
# Dwelling Units 0 # Structures 0
;FP,/ Removing/replacing the existing shingles on the house and replacing the oh head doors with 2 standard size doom. The new
wner is Brian Pizon.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation $5,000.00 Plan Approval $0.00 Permit Fee Paid
Issued By: ' Date 09/11/2003
In the performadce of this work I agree to perform all work pursuant to rules governing the described construction.
$40.00 Park Dedication $0.00
Final/O.P. 00/00/0000
While the City of Oshkosh has no authority to enforce easement restrictions of which it is eot a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contac'[ the easement
Signatureh°lder(s) and,~__ ~,~_.,,~ ~_~:~to sec~ any necessary approvals before starting such activity. Date~- ?,,~//~ (~
0~ Agent/Owner
Address 676 W 4TH AVE OSHKOSH WI 54902 - 5802 Telephone Number 420-7253
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.