Loading...
HomeMy WebLinkAbout0104100-Building (roof/overhead door)OSHKOSH ON THE WATER ,lob Address 1015 CHERRY ST Designer Category Type · Building Zoning Unfinished/Basement Finished/Living Garage 141 - Exterior Remodeling Foundation Occupancy Permit Park Dedication Use/Nature of Work CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner ELIZABETH M NIEMUTH Contractor OWNER No 104100 Create Date 09/11/2003 Plan Sign (~) Canopy ~ Fence ~ Raze Class of Const: Size 0 Sq. Ft. Rooms 0 Height 0 Ft. [] Projection 0 Sq. Ft. Bedrooms 0 Stories Canopies __ 0 Sq. Ft. Baths 0 Signs · Poured Concrete (~ Floating Slab O Pier (~ Other (~) Concmta Block (~ Post {~ Treated Wood Flood Plain Height Permit # Dwelling Units 0 # Structures 0 ;FP,/ Removing/replacing the existing shingles on the house and replacing the oh head doors with 2 standard size doom. The new wner is Brian Pizon. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $5,000.00 Plan Approval $0.00 Permit Fee Paid Issued By: ' Date 09/11/2003 In the performadce of this work I agree to perform all work pursuant to rules governing the described construction. $40.00 Park Dedication $0.00 Final/O.P. 00/00/0000 While the City of Oshkosh has no authority to enforce easement restrictions of which it is eot a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contac'[ the easement Signatureh°lder(s) and,~__ ~,~_.,,~ ~_~:~to sec~ any necessary approvals before starting such activity. Date~- ?,,~//~ (~ 0~ Agent/Owner Address 676 W 4TH AVE OSHKOSH WI 54902 - 5802 Telephone Number 420-7253 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.