Loading...
HomeMy WebLinkAbout2013-Electric (addn to #145753) � CITY OF OSHKOSH No 156558 OSHKOSH ELECTRIC PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 333 ROSALIA ST Owner MICHAEL J/SHERYL M DREIKOSEN Create Date 07/05/2013 Contrector HOMEOWNER Category 612-Residential-Single Family Addition/R Plan Inspector Adam Krause Service New � Change 0 Temp � N/A —� Type � Overhead � Underground I Volts Circuits Luminaires Amps Switches Receptacles Appliances I Use/Nature of iSFR\Remodel-continuation of previous permit#147215 Work Fees: Valuation $400.00 Plan Approval $0.00 Permit Fee Paid $30.00 issued By: �� Date 7/5/2013 ❑ Permit Voided � Parcel Id# 0205150000 The undersigned,in applying for an Electric Permit to perform electrical work within a single family home,owned and occupied as the principle residence by the undersigned,hereby acknowledges per City Municipal Code Section 11-22,that other individua�s may not be employed to assist with the work described in this permit unless said individuais are licensed by the City of Oshkosh to perform said work. In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to ecurg any ne ss app ovals before starting such activity. Signature � Date � �� j� � Agent/Owner Address MICHAEL J/SHERYL M DREIKOSEN LOMIRA WI 5304- 9760 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.