HomeMy WebLinkAbout0156489-Building (siding) � CITY OF OSHKOSH No 156489
�
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 1277 ELMWOOD AVE Owner MONICA L CEISEL Create Date 07/02/2013
Designer Contractor CUSTOM HOME SOLUTIONS LLC
Inspector John Zarate
Category 042-Residential Siding Plan
Type � Building � Sign � Canopy � Fence � Raze �
Zoning R-1C Class of Const:
Size
Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection �
Finished/Living Sq.Ft. Bedrooms Stories Canopies
Garage Sq.Ft. Baths _ Signs
Foundation � Poured Concrete � Floating Slab � Pier 0 Other
� Concrete Block � Post � Treated Wood
Occupancy Permit Occupancy Fee _ $0.00 Flood Plain Height Permit
Park Dedication #Dwelling Units 0 #Structures 0
Use/Nature Duplex/Installing siding on house only due to age. Replacing vinyl with vinyl. Electric not applicable because of no outside lights. No
of Work structural changes :
I
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $8,000.00 Plan Approval $0.00 Permit Fee Paid $86.00 Park Dedication $0.00
Issued By: //,� Date 07/02/2013 Final/O.P. 00/00/0000
❑ Permit Voided' Parcel Id# 1201770000 '
In the performance of this work I agree to perForm all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)an ecure any ne ssary approvals before starting such activity.
I have read and u tand th fore mentioned information.
Signature Date
Agent/Owner
Address 50 FOX FIRE DR OSHKOSH WI 54904 - 6596 Telephone Number (920)379-8739
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.