Loading...
HomeMy WebLinkAbout0156489-Building (siding) � CITY OF OSHKOSH No 156489 � OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 1277 ELMWOOD AVE Owner MONICA L CEISEL Create Date 07/02/2013 Designer Contractor CUSTOM HOME SOLUTIONS LLC Inspector John Zarate Category 042-Residential Siding Plan Type � Building � Sign � Canopy � Fence � Raze � Zoning R-1C Class of Const: Size Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection � Finished/Living Sq.Ft. Bedrooms Stories Canopies Garage Sq.Ft. Baths _ Signs Foundation � Poured Concrete � Floating Slab � Pier 0 Other � Concrete Block � Post � Treated Wood Occupancy Permit Occupancy Fee _ $0.00 Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 Use/Nature Duplex/Installing siding on house only due to age. Replacing vinyl with vinyl. Electric not applicable because of no outside lights. No of Work structural changes : I HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $8,000.00 Plan Approval $0.00 Permit Fee Paid $86.00 Park Dedication $0.00 Issued By: //,� Date 07/02/2013 Final/O.P. 00/00/0000 ❑ Permit Voided' Parcel Id# 1201770000 ' In the performance of this work I agree to perForm all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)an ecure any ne ssary approvals before starting such activity. I have read and u tand th fore mentioned information. Signature Date Agent/Owner Address 50 FOX FIRE DR OSHKOSH WI 54904 - 6596 Telephone Number (920)379-8739 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.