HomeMy WebLinkAbout0104160-Plumbing (water service)OSHKOSH
ON THE WATER
Job Addree$ 2310 W WAUKAU AVE
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner JOHN FRINGS
Contractor BERNDT EXCAVATING
Category 401 - Residential-Exterior (laterals)
No 104160
Create Date 09/15/2003
Plan
Bathtub 0 Shower 0 Ejector/Grind 0 DipWell 0 F Prep Sink 0 Gar Drain 0
Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0
Lavatory 0 LndryTray 0 LocaIWaste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0
Toilet 0 LndryStndp 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink 0 Iht Grease Trap 0
Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
Bar Sink 0 Dishwasher 0 Beer Tap 0 SculrySink 0 Wash Ftn 0 RPZValve 0
Water Heater 0 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 EyeWash Statn 0
Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0
Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0
Use/Nature ~ewer & Water service
of Work
Size Material Type #
Sanitary Sewer 4" Plastic Lateral
Storm Sewer
Conn. Type
New
0
0
0
Water Service 1" Copper Lateral I New
0
0
0
0
Valuation $3,000.00 Plan Approval $0.00 Permit Fees $50.00 [] Permit Voided J
Issued Byl~
Date 09/15/2003
In the pedormance of this work, I agree to pedorm all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to sec~4re ¢~ n%2~,~h activity.
Agent/Owner
Address 2527 W WAUKAU AVE OSHKOSH WI 54904 - 0000 Telephone Number 235-3331
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.