Loading...
HomeMy WebLinkAbout0156431-Building (siding) � CITY OF OSHKOSH No 156431 � OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 2620 W 20TH AVE Owner LARRY R KOEPPEN Create Date 06/27/2013 Designer Contractor DNR ENTERPRISES INC Inspector Nathan Littlefield Category 042-Residentia�Siding Plan Type � Building � Sign 0 Canopy � Fence � Raze Zoning R-1 Ciass of Const: Size Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection 'i Finished/Living Sq.Ft. Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs : Foundation � Poured Concrete � Floating Slab � Pier � Other � Concrete Block � Post � Treated Wood Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain _ Height Permit Not Required Park Dedication Not Required #Dweiling Units 0 #Structures 0 Use/Nature �SFR/Install siding on house only. Two elevations only. Replacing vinyl with vinyl siding. Electric not applicable because J blocks of Work Ipreviously installed. Wrapping some windows and replacing 3 garage doors. No structural changes. , : � I HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $5,200.00 Plan Approval $0.00 Permit Fee Paid $72.00 Park Dedication $0.00 Issued By: Date O6/27/2013 Final/O.P. 00/00/0000 ❑ Permit Voided', Parcel Id# 1316480000 In the perFormance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement . holder(s)and cu an ecessa pprovals befo starting such activity. i have r and tand e mentioned' rmation. Signature � Date Age UOwner Address 1434 HAZEL ST OSHKOSH WI 54901 - 0000 Telephone Number 231-1619 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. City of Oshkosh � Inspection Services Division � P O Box 1130 Oshkosh,WI 54903-1 1 30 Phone:(920)236-5050 �HK01H Fax:(920)236-5084 OA TH� V✓AiFk � Roofing & Siding Permit Application • Application(s)and fee(s)can be brought to City Hall,Room 205 ar mailed to Inspection Services,PO Box 1128, Oshkosh WI 54903-1128. Commencing work without permit(s)will result in fees being doubled or$100.00 plus the normal permit fee,which ever is greater. OR If vou are a contractor narticipating_in the Permit fee Account Svstem and have adeguate funds, check here if vou want this processed through vour account (� JOB ADDRESS 2G Zf� (��. 2O� �,V� OW NER /"1�. �d�.Y �,�P�7�-� CONTRACTOR �� �,'�p�' I am the: ❑ Owner OR �Contractor USE CATEGORY ��'Singie Family ❑Duplex ❑Multi-Family O Rental ❑Commercial ❑Industrial � � Work being done: ROOFING ❑Tear off and replace existing roofing on O house,❑garage ❑Replace wood decking O Add 1 layer of roofing to the existing layer(s)on�house,�garage This work is being done due''�Hail Damage ❑Other SIDING ❑Install siding on.�house, ❑garage Z C.�ti9�'�7oNs �C��' l a Replacing vinyl with vinyl ❑Replacing steel or aluminum with vinyl(circle steel or aluminum) ❑Replacing with This work is being done due to O Hail Damage ❑Other When siding is done, one of the boxes below must be checked: 1) ❑Electric—Existing Electric Meter,receptacle,lighting and Electric Service entrance alterations/modifications are being performed by (Name of Licensed Electric Contraaor) AND '__ Electric Installation Verification form is attached OR 'Separate Elect Permit will be requested. 2) �Electric—Not Applicable because: :�!J�Blocks previously installed C:No outside lights. '.-:Other O Install new or❑Replace gutters ❑Install new or❑Replace downspouts Other related work being done: (please note) � ,t�p� � �o�� �,,•r�s , c�a u�v� � �.��a �� �' Value of the ob$ °�' J �� r'"'�'^r---- (include fair mazket price for labor even ifyou aze not paying for labor) 03/02