Loading...
HomeMy WebLinkAbout0156349-Building � CITY OF OSHKOSH No 156349 OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 1934 FABRY ST Owner LUCIA L FRANZEN Create Date 06/2U2013 Designer Contractor DEL TRITT CONSTRUCTION LLC Inspector Nicole Krahn Category 111 -Single FamilyAddition Plan Type � Building � Sign � Canopy � Fence � Raze � Zoning R-1 Class of Const: Size Unfinished/Basement Sq.Ft. Rooms Height Ft. � Projection 'i Finished/Living 256 Sq.Ft. Bedrooms Stories Canopies Gara9e Sq.Ft. Baths Signs Foundation � Poured Concrete � Floating Slab � Pier 0 Other � Concrete Block 0 Post � Treated Wood Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 Use/Nature SFR/16'x 16'sunroom addition*Poured wall foundation,covered recessed stoop included with this plan. "check#8786 of Work I, I ; , HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $35,000.00 Plan Approval $50.00 Permit Fee Paid $71.08 Park Dedication $0.00 Issued By: � Date 06/24/2013 Final/O.P. 00/00/0000 ❑ Permit Voided ! Parcel Id# 1412480000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to re any necessary approvals before starting such activity. I have read a d und rstand the afore mentioned information. Signature � � Date AgenUOwner Address 6228 COUNTY RD N PICKETT WI 54964 - 9533 Telephone Number 589-4209 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.