Loading...
HomeMy WebLinkAbout0104112-Building (side platform)OSHKOSH ON THE WATER .lob Address 315 FULTON AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner CARLTON L PAULUS Contractor OWNER Category 141 - Exterior Remodeling No 104112 Create Date 09/11/2003 Plan Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete (~) Floating Slab (~) Pier (~) Other (~) Concrete Block (~) Post (~) Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/Constructing a 4'x4' side platform with steps. A minimum of 48" of frost protection is required in addition to code compliant handrails and of Work uardrails. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $500.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Date 09/11/2003 Final/O.P. 00/00/0000 Permit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 315 FULTON AVE OSHKOSH WI 54901 - 4507 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. OSHKOSH ON THE WATER ,Job Addreae 315 FULTON AVE Designer Category 141 - Exterior Remodeling Type · Building (~ Sign CITY OF OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD Owner CARLTON L PAULUS Contractor OWNER C) canopy (~ Fence CRaze No 104112 Create Date 09/1 t/2003 Plan Zoning Unfinished/Basement Finished/Living Garage Foundation 0 Sq. Ft. 0 Sq. Ft. 0 Sq. Ft. Baths · Poured Concrete (~ Floating Slab O Pier (~ Concrete Block (~ Post Occupancy Permit Not Required Park Dedication Class of Const: Rooms 0 Height Bedrooms 0 Stories 0 Other C) Treated Wood Flood Plain Height Permit # Dwelling Units 0 # Structures Size [] Projection Canopies 0 Signs 0 0 Use/Nature ~FR/Constructing a 4'x4' side platform with steps, A minimum of 48" of frost protection is required in addition to code compliant of Work ~andrails and guardrails. HVAC Contractor Electric Contractor Fees: Valuation Issued By: ~ $500.00 Plan Approval Plumbing Contractor $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Date 09/11/2003 Final/O.P. 00/00/0000 [] Permit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easemen~e City strongly urges the permit applicant to contact the easement holder(s) and t~re any nec4~sary approvals b/~fore ¢tarting~uch activity. Signature ,*'-~/¢~/~~ ¢('/~¢'~ ~ Date ~ ~ v .- ~.,/] AgenF~Owner ~ Address 315 FULTON AVE OSHKOSH WI 54901 - 4507 Telephone Number To schedule inspections please call the Inspection Request line at 236-5t28 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.