HomeMy WebLinkAbout0104112-Building (side platform)OSHKOSH
ON THE WATER
.lob Address 315 FULTON AVE
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner CARLTON L PAULUS
Contractor OWNER
Category 141 - Exterior Remodeling
No 104112
Create Date 09/11/2003
Plan
Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation O Poured Concrete (~) Floating Slab (~) Pier (~) Other
(~) Concrete Block (~) Post (~) Treated Wood
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature SFR/Constructing a 4'x4' side platform with steps. A minimum of 48" of frost protection is required in addition to code compliant handrails and
of Work uardrails.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$500.00 Plan Approval $0.00 Permit Fee Paid
$20.00 Park Dedication $0.00
Date 09/11/2003 Final/O.P. 00/00/0000
Permit Voided
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 315 FULTON AVE OSHKOSH WI 54901 - 4507 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
OSHKOSH
ON THE WATER
,Job Addreae 315 FULTON AVE
Designer
Category 141 - Exterior Remodeling
Type · Building (~ Sign
CITY OF OSHKOSH
BUILDING PERMIT -APPLICATION AND RECORD
Owner CARLTON L PAULUS
Contractor OWNER
C) canopy (~ Fence CRaze
No 104112
Create Date 09/1 t/2003
Plan
Zoning
Unfinished/Basement
Finished/Living
Garage
Foundation
0 Sq. Ft.
0 Sq. Ft.
0 Sq. Ft. Baths
· Poured Concrete (~ Floating Slab O Pier
(~ Concrete Block (~ Post
Occupancy Permit Not Required
Park Dedication
Class of Const:
Rooms 0 Height
Bedrooms 0 Stories
0
Other
C) Treated Wood
Flood Plain Height Permit
# Dwelling Units 0 # Structures
Size
[] Projection
Canopies 0
Signs 0
0
Use/Nature ~FR/Constructing a 4'x4' side platform with steps, A minimum of 48" of frost protection is required in addition to code compliant
of Work ~andrails and guardrails.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By: ~
$500.00 Plan Approval
Plumbing Contractor
$0.00 Permit Fee Paid $20.00 Park Dedication $0.00
Date 09/11/2003 Final/O.P. 00/00/0000
[] Permit Voided
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easemen~e City strongly urges the permit applicant to contact the easement
holder(s) and t~re any nec4~sary approvals b/~fore ¢tarting~uch activity.
Signature ,*'-~/¢~/~~ ¢('/~¢'~ ~ Date ~
~ v .- ~.,/] AgenF~Owner ~
Address 315 FULTON AVE OSHKOSH WI 54901 - 4507 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5t28 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.