Loading...
HomeMy WebLinkAbout0104078-Building (parking lot)OSHKOSH ON THE WATER ,lob Address 915 MALLARD AVE Designer Category Type Zoning Unfinished/Basement Finished/Living Garage 256 - Parking Lots, Driveways · Building (~) Sign 0 Sq. Ft. 0 Sq. Ft. 0 Sq. Ft. Foundation Poured Concrete ~) Floating Slab Concrete Block (~) Post CITY OF OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD Occupancy Permit Not Required Park Dedication Use/Nature ~,partment/Repave entire / of Work No 104078 Owner CHARLES NMARIL PERRY Contractor BADGER HIGHWAYS Canopy (~ Fence O Raze Class of Const: Create Date Plan Size 09/10/2003 Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 (~) Pier · Other (~ Treated Wood Flood Plain Height Permit # Dwelling Units 0 # Structures [] ProjectionI Canopies Signs 0 perking lot. Remove existing, regrede base and repave with 2" binder and 1" surface coat. HVAC Contractor Electric Contractor Plumbing Contractor Fees: Valuation Issued By: j47,835.00 Plan Approval $0.00 Permit Fee Paid [] Permit VoidedI $179.00 Park Dedication $0.00 Date 09/10/2003 Final/O.P. 00/00/0000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature (--~:~lJ~.~.~"-~:f~)3-' ~ ~.~.~~ j Date qo ~ Ag~ent/O!~vner~'~ Address 1360 GREENWAYTER ELM GROVE WI 53122 - 1607 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.