HomeMy WebLinkAbout0104071-Plumbing (water heater)OSHKOSH
ON THE WATER
Job Address 18 FUGLEBERG TRL
CITY OF OSHKOSH
PLUMBING PERMIT -APPLICATION AND RECORD
Owner WALTER R R BAHPJROBERTA K MESSE
Contractor MS PLUMBING
Category 411 - Residential-Water Heaters
Bathtub 0 Shower 0 Ejector/Grind
Whirlpool 0 Floor Drain 0 Water Softner
Lavatory 0 Lndry Tray 0 Local Waste
Toilet 0 LndryStndp 0 Clothes Wshr __
Res. Sink 0 Disposal 0 Bidet
Bar Sink 0 Dishwasher 0 Beer Tap
Water Heater 1 Sump Pump 0 Dent. Oper.
Site Drain 0 Classrm Sink 0 Lab Sink
Roof Drain 0 Breakrm Sink 0 Sterilizer
0 Dip Well 0 F Prep Sink
0 Drink Ftn 0 ServSink
0 Wait. St. 0 ShampSink
0 Ice Chest 0 FIr/Wst Sink
0 Exam Sink 0 Catch Basin
0 SculrySink 0 Wash Ftn
0 Hand Sink 0 Urinal
0 Plaster Sink 0 Standp Rec
0 Surgeons Sink 0 Ice Maker
No 10407i
Create Date 09/10/2003
Plan
0 Gar Drain 0
0 Soda Disp 0
0 Coffee Maker 0
0 tht Grease Trap 0
0 Ext Grease Trap 0
0 RPZ Valve 0
0 Eye Wash Statn 0
0
0
Use/Nature
of Work
REPLACE NG WTR HTR
Sanitary Sewer
Storm Sewer
Water Service
Size
Valuation $500.00 Plan Approval $0.00 Permit Fees
Issued By
Material Type #
Corm. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$20,00 [] Permit Voided
Date 09/10/2003
In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restdctioss of which it is not a party, if you perform the work
described in this permit applicat[en withirl.arr'~sel;i~nt, the Cil;;¢ strongly urges the permit applicant to contact the
easement h~e~ t'~s~_ur.e.~n~C"s~rovals~.~e startthg such activity. '
Address ~6~60 CTY RD F:~ ?~0Owner WI 54963 - 0000 Telephone Number 920-685-0473
To schedule inspections please call the Inspection Request line at 236-5t28 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at th;; time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.