HomeMy WebLinkAbout0104113 BOSHKOSH
ON THE WATER
.lob Address 1080 N WESTFIELD ST
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner EVERGREEN RETIREMENTCOMMINC
Contractor DAN V BINDER CONSTRUCTION
Category 141 - Exterior Remodeling
No 104113
Create Date 09/11/2003
Plan
Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation O Poured Concrete (~) Floating Slab (~) Pier (~) Other
(~) Concrete Block (~) Post (~) Treated Wood
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature
of Work
Unit Condo/Replace all windows facing courtyard, except 6 which will be filled in with wall panels.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$20,000.00 Plan Approval $0.00 Permit Fee Paid
$95.00 Park Dedication $0.00
Date 09/11/2003 Final/O.P. 00/00/0000
Permit Voided
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 1224 W SOUTH PARK AVE OSHKOSH WI 54902 - 0000 Telephone Number 231-2114
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.