HomeMy WebLinkAbout0104099-Building (raise bay)OSHKOSH
ON THE WATER
JobAddress 1611 W20THAVE
Designer
Category
Type · Building
Zoning
CITY OF OSHKOSH
No 104099
BUILDING PERMIT - APPLICATION AND RECORD
Owner PHIL RUEDINGER & PAT RUEDINGER Create Date
Contractor PACKER VALLEY BUILDERS, INC
232 - Alteration Stores & Customer Service Plan
Sign O Canopy O Fence O Raze
Class of Const: Size
0 Ft.
[] Projection
Canopies
Signs
Unfinished/Basement 0 Sq. Ft. Rooms
Finished/Living 0 Sq. Ft. Bedrooms
Garage 0 Sq. Ft. Baths 0
Foundation · Poured Concrete O Floating Slab O Pier
(~ Concrete Block (~) Post O Treated Wood
Not Required Flood Plain
# Dwelling Units
~elf Serve Car Wash/Raise height of South bay by 2'.
Height
Stories
Other
Occupancy Permit
Park Dedication
Use/Nature
of Work
Height Permit
0 # Structures 0
09/11/2003
HVAC Contractor
Electric Contractor
Plumbing Contractor
Fees: Valuation $4,900.00
Issued By: .~
Plan Approval
$0.00 Permit Fee Paid
[] Permit Voided J
$40.00 Park Dedication $0.00
Date 09/11/2003 Final/O.P. 00/00/0000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application with~.~asement, the City strongly urges the permit applicant to contact the easement
holder(s) and(~cure aey necessary ~lporov~,before starting such activity.
Signature '~.~)% ~ Date ~'J/J/~
- - % '~ % AgentJOwner
Address 2277 CLAIRVILLE ROAD OSHKOSH Wi 54904 - 0000 Telephone Number 920-232-7620
To schedule inspections please call the Inspection Request line at 236-5f28 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.