Loading...
HomeMy WebLinkAbout0104077-Building (siding)OSHKOSH ON THE WATER Job Address 918 HURON AVE Designer Category 141 - Extedor Remodeling Type · Building (~ Sign CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner DAVID/KATHLEEN SCHLICHTING Contractor SALZER SIDING C) canopy C) Fence O Raze No 104077 Create Date 09/10/2003 Plan Zoning Class of Const: Unfinished/Basement 0 Sq. Ft. Rooms 0 Height Finished/Living 0~ Sq. Ft, Bedrooms 0 Stories Garage 0 Sq. Ft. Baths 0 Foundation · Poured Concrete ~) Floating Slab (~ Pier ~) Concrete Block O Post O Treated Wood Occupancy Permit Not Required Flood Plain Park Dedication # Dwelling Units (~Other 0 0 Ft. Size [] Projection j Canopies Signs Height Permit # Structures 0 0 0 Use/Nature ~FPJ LATE PERMIT/Installed vinyl siding on the house and wrapped the sof~t and fascia. NO ELEC WORK. of Work HVAC Contractor Electric Contractor $5,820.00 Plan Approval PI0mbing Contractor $0.00 Permit Fee Paid [] Permit Voided $45.00 Park Dedication $0.00 Date 09/10/2003 Final/O.P, 00/00/0000 in the performance of this work I agree to perform all work pursuant to rules goveming the described construction, While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to se~,~ any necessaw4~pprovals before ~s~ra, riing such activity. Signature~ ,~ ~...f.~(.~ L-'~{~/~.J..~,.~ ~,k~L.~-~- Date Address 918 HURON AVE OSHKOSH~,...._...~ 54901 - 3143 Telephone Number 0 -d~ To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.