HomeMy WebLinkAbout0104077-Building (siding)OSHKOSH
ON THE WATER
Job Address 918 HURON AVE
Designer
Category 141 - Extedor Remodeling
Type · Building (~ Sign
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner DAVID/KATHLEEN SCHLICHTING
Contractor SALZER SIDING
C) canopy C) Fence O Raze
No 104077
Create Date 09/10/2003
Plan
Zoning Class of Const:
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height
Finished/Living 0~ Sq. Ft, Bedrooms 0 Stories
Garage 0 Sq. Ft. Baths 0
Foundation · Poured Concrete ~) Floating Slab (~ Pier
~) Concrete Block O Post O Treated Wood
Occupancy Permit Not Required Flood Plain
Park Dedication # Dwelling Units
(~Other
0
0 Ft.
Size
[] Projection j
Canopies
Signs
Height Permit
# Structures 0
0
0
Use/Nature ~FPJ LATE PERMIT/Installed vinyl siding on the house and wrapped the sof~t and fascia. NO ELEC WORK.
of Work
HVAC Contractor
Electric Contractor
$5,820.00 Plan Approval
PI0mbing Contractor
$0.00 Permit Fee Paid
[] Permit Voided
$45.00 Park Dedication $0.00
Date 09/10/2003 Final/O.P, 00/00/0000
in the performance of this work I agree to perform all work pursuant to rules goveming the described construction,
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to se~,~ any necessaw4~pprovals before ~s~ra, riing such activity.
Signature~ ,~ ~...f.~(.~ L-'~{~/~.J..~,.~ ~,k~L.~-~- Date
Address 918 HURON AVE OSHKOSH~,...._...~ 54901 - 3143 Telephone Number
0 -d~
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.