HomeMy WebLinkAbout0104079 POSHKOSH
ON THE WATER
,Job Address 521 W 16TH AVE
Contractor ZlLLGES EXCAVATING
Bathtub 0 Shower
Whirlpool 0 Floor Drain
Lavatory 0 Lndry Tray
Toilet 0 Lndry Stndp
Res. Sink 0 Disposal
Bar Sink 0 Dishwasher
Water Heater 0 Sump Pump
Site Drain 0 Classrm Sink
Roof Drain 0 Breakrm Sink
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner ZION LUTHERAN CHURCH
Category 430 - Industrial-Exterior (laterals)
No 104079
Create Date 09/10/2003
Plan C5-49-0903-P
0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain 0
0 WaterSoftner 0 Drink Ftn 0 ServSink 0 Soda Disp 0
0 Local Waste 0 Wait. St. 0 ShampSink 0 Coffee Maker 0
0 CIothesWshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap 0
0 Bidet 0 Exam Sink 0 Catch Basin 2 Ext Grease Trap 0
0 Beer Tap 0 SculrySink 0 Wash Ftn 0 RPZValve 0
0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0
0 Lab Sink 0 Plaster Sink 0 Standp Rec 0
0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0
Use/Nature
of Work
NEW 16 UNIT APT BLDG
Size Material Type # Conn. Type
Sanitary Sewer 0
0
4 Plastic Lateral 1 New
0
0
Storm Sewer 0
0
8 Plastic Lateral 1 New
0
0
Water Service 0
0
6 Plastic Lateral 1 New
0
0
Valuation $3,500.00 Plan Approval $0.00 Permit Fees $87.00 ~ Permit Voided
Issued By
Date
09/10/2003
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 1800 FOUNTAIN AVE Oshkosh WI 54904 - 0000 Telephone Number
376-1005
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.