HomeMy WebLinkAbout0156244-Building (windows) � CITY OF OSHKOSH No 156244
�
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 35 W NEVADA AVE Owner TIMOTHY P FULLER Create Date 03/06/2013
Designer Contractor ASHTON CONSTRUCTION
Inspector Kenneth Gresser
Category 040-Windows Plan
Type � Buiiding � Sign � Canopy � Fence � Raze I
Zoning R-2 Class of Const: Size
Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection j '
Finished/Living Sq.Ft. Bedrooms Stories Canopies
Garage Sq.Ft. Baths Signs
Foundation � Poured Concrete 0 Floating Slab � Pier � Other
� Concrete Block � Post � Treated Wood
Occupancy Permit Not Required Occupancy Fee $0.00 Fiood Plain Height Permit Not Required
Park Dedication Not Required #Dwelling Units 0 #Structures 0
Use/Nature SFR/Install 15 new vinyl replacement windows(same size&locations),and replace garage door. '•check#3383
of Work
� I
- _ J :
HVAC Contractor Plumbing Contractor
Electric Contracto�
Fees: Valuation $5,700.00 Plan Approval $0.00 Permit Fee Paid $72.00 Park Dedication $0.00
Issued By: (�(,� Date 06/18l2013 Final/O.P. 00/00/0000
,
❑ Permit Voided i Parcel Id# 1500910000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perForm the work
described in this permit applicatio within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to sec a ne ssa ap rov bef e starting such activity.
I have read ar�d u rs nd af e io d in
Signature Date
AgenUOwner
Address 5308 COUNTY ROAD R OSHKOSH WI 54902 - 8504 Telephone Number (920)233-0870
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.