HomeMy WebLinkAbout0156150-Building (roof) �
�
� CITY OF OSHKOSH No 156150
�
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 427 W 9TH AVE Owner ROBERT RIECKMAN Create Date 06/04/2013
Designer Contractor OWNER
Inspector Nicole Krahn
Category 041 -Residential Roofing Plan
Type � Building 0 Sign � Canopy 0 Fence � Raze I
Zoning R-2 Class of Const: Size
Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection �
Finished/Living Sq.Ft. Bedrooms Stories Canopies
Garage Sq.Ft. Baths Signs �
Foundation � Poured Concrete 0 Floating Slab � Pier � Other
� Concrete Block � Post � Treated Wood 3
�
Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit
Park Dedication #Dwelling Units 0 #Structures 0
Use/Nature SFR/reroofing house and garage I �
of Work ;
,
� i
i �
�
HVAC Contractor Plumbing Contractor
E
Electric Contractor
Fees: Valuation $17,998.00 Plan Approval $0.00 Permit Fee Paid $148.00 Park Dedication $0.00
Issued By: Date 06/12/2013 Final/O.P. 00/00/0000 ;
x
❑ Permit Voided�i Parcel Id#0906130000 �
In the performance of this work I agree to perform all work pursuant to rules governing the described construction. ?
While the Ciry of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
e
described in this pe application within n easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to s u any ecessa p ovals before starting such activity.
I have read and a the for ntione information.
Signature Date �6—�2-�,�
AgenUOwner
Address Oshkosh WI 54901 - 0000 Telephone Number
1
I
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specifed otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not perFormed within two business days from the time the project is ready.
�