HomeMy WebLinkAbout0156119-Building (siding) � CITY OF OSHKOSH No 156119
�
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 191 195 S WESTFIELD ST Owner JAMES J MATTHEWS Create Date 06/06/2013
Designer Contractor KRIER'S CONSTRUCTION
Inspector Nicole Krahn
Category 042-Residential Siding Plan
Type � Building � Sign _p Canopy � Fence � Raze �
Zoning R-2 Class of Const: Size
Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection I
Finished/Living Sq.Ft. Bedrooms Stories Canopies
Garage Sq.Ft. Baths Signs
Foundation � Poured Concrete � Floating Slab � Pier 0 Other
� Concrete Block 0 Post � Treated Wood
Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit
Park Dedication #Dwelling Units 0 #Structures 0
Use/Nature Duplex/Re-siding`to include removal of existing siding and replace with new. Existing J-blocks for electrical fixtures.
of Work
� �
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $11,000.00 Plan Approval $0.00 Permit Fee Paid $106.00 Park Dedication $0.00
Issued By: �j Date 06/11/2013 Final/O.P. 00/00/0000
❑ Permit Voided'; Parcel Id#0615140000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to secure any necessary approvals before starting such activity.
I have read and under e afore men' d information.
Signature Date
Agent/Owner
Address PO BOX 3424 OSHKOSH WI 54903 - 3424 Telephone Number (920)685-2333
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.