Loading...
HomeMy WebLinkAbout0155928-Building � CITY OF OSHKOSH No 155928 OSHKOSH COMMERCIAL BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 1008 VERN AVE-EAA GROUNDS Create Date 05/17/2013 Project Restrrom Addition Project Number 20130458 Owner Plan Z3-3766-0513 Contractor M.P.B. BUILDERS INC Inspector Nicole Krahn Designer Category 204-Addition Amusement,Social,Recreation Type of Plan Alt.Level 2 Zoning Square Footage Major Occ Assembly Const Class Type IIB Fire Protection � Sprinkled � Unsprinkled � Sprinkler Design NFPA-13 Occupancy Permit Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 � Projection Canopies Signs Use/Nature of Work COMM/Restroom addition'to hanger"B"per State approved plans. As a condition of approval a holding tank agreement from the county shall be pproved for work above the grade on this project. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $400,000.00 Plan Approval $0.00 Permit Fee Paid $623.70 Park Dedication $0.00 Issued By: �� Date 06/03/2013 Final/O.P. 00/00/0000 ❑ Permit Voided I Parcel Id# In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the Ciry of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perForm the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to s ure any necessary approvals before starting such activity. I have read u derstand the af re entioned information. ✓� � Signature dv L�j ,� �1 Date �o AgenUOwner Address 54 E OSHKOSH ST RIPON WI 54971 - 1160 Telephone Number 748-2601 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. '