Loading...
HomeMy WebLinkAbout0155933-Building (off street parking) � CITY OF OSHKOSH No 155933 � OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 100 CITY CENTER Owner CITY CENTER ASSOCIATES LLC Create Date 06/03/2013 Designer Contractor NORTHEAST ASPHALT INC Inspector John Zarate Category 257-Commercial Parking Lot/Driveway Plan Type � Building � Sign � Canopy � Fence 0 Raze I Zoning C-3D0 Class of Const: Size Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection i Finished/Living Sq.Ft. Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation � Poured Concrete � Floating Slab � Pier � Other � Concrete Block 0 Post 0 Treated Wood Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 Use/Nature Commercial—reconstruction of off-street parking facilities per plan for"City Center' , of Work i � i I HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $22,000.00 Plan Approval $0.00 Permit Fee Paid $373.00 Park Dedication $0.00 Issued By: ��J ` Date 06/03/2013 Final/O.P. 00/00/0000 ❑ Permit Voided j Parcel Id#0100600000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perForm the work described in thi�ermit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and t se re any necessary approvals before starting such activity. I have read an nd rstand th ore mentioned information. / � Signature Date � <U! �� AgenUOwner Address W638 ESIGN DR _GREENVILLE WI 54942 - 0000 Telephone Number 920-757-2900 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.