HomeMy WebLinkAbout09. 13-256MAY 28, 2013 13 -256 RESOLUTION
(CARRIED 6 -0 LOST LAID OVER WITHDRAWN
PURPOSE: AWARD BID FOR PUBLIC WORKS CONTRACT NO. 13 -20 TO
CARL BOWERS & SONS CONSTRUCTION COMPANY INC. FOR
MINI STORM SEWERS AND STORM SEWER LATERALS
($103,001.80)
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
WHEREAS, the City of Oshkosh has heretofore advertised for bids for storm sewer
laterals at various locations; and
WHEREAS, upon the opening and tabulation of bids, it appears that the following is
the most advantageous bid:
CARL BOWERS & SONS CONSTRUCTION COMPANY, INC.
N1844 Maloney Road
Kaukauna, WI 54130
Total Bid: $103,001.80
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of
Oshkosh that the said bid is hereby accepted and the proper City officials are hereby
authorized and directed to enter into an appropriate agreement for the purpose of same, all
according to plans, specifications, and bid on file. Money for this purpose is hereby
appropriated from:
Acct. No. 317 - 0410 - 7480 -03305 Special Assessments Fund — Storm Water
561 - 2010- 1799 -00000 Storm Water Utility Construction Work in Progress
( 0
OfHKOIH
ON THE WATER
MEMORANDUM
TO:
FROM
DATE:
RE:
Honorable Mayor and Members of the Common Council
Steven M. Gohde, Assistant Director of Public Works Sm�J
May 23, 2013
Award Bid for Public Works Contract No. 13 -20
Mini Storm Sewers and Storm Sewer Laterals
Carl Bowers & Sons Construction Co., Inc. 1($103,001.80)
BACKGROUND
The purpose of this project is to construct mini storm sewers and storm sewer laterals at various locations
around the City. Properties include those who have requested a storm sewer lateral, and adjacent
properties where minimal additional work is required to install a lateral. The laterals allow the property
owner to discharge sump pump water to the storm sewer system versus the ground surface. Sump pump
discharges to ground surfaces can create standing water issues in the summer and ice in the winter on
sidewalks and streets.
ANALYSIS
Engineering staff reviewed three bids. The low bid was received from Carl Bowers & Sons Construction
Co., Inc. of Kaukauna, Wisconsin. The total bid is $103,001.80.
FISCAL IMPACT
Funding for the project is in the 2013 Capital Improvement Program. Following is a summary of the
available funds and the construction costs including engineering fees. Property owners are assessed a
fixed fee for the storm lateral per the Special Assessment Policy.
CIP Section
CIP Funds Budgeted
Construction Costs with En r
Storm Sewer
$120,000
$115,362
Totals
$120,000
$115,362
RECOMMENDATIONS
recommend award to the low bidder, Carl Bowers & Sons Construction Co., Inc., in the amount of
$103,001.80.
Approved:
Ma A. Rohloff
City Manager
SMGItIt
MEngineerin9113 -26 Mini Storm Swrs•Storm Laterals\ Project_ Information %CorrespcndenceWemo113 -20 Memo for Bid Award_5- 23- 13.docx
Item I
1120
BID TABULATION Contract 13 -20
Mini Storm Sewers /Storm Laterals
BIDDERS
Bid Date: Tuesday, May 21, 2013
Bid Time: 10:30 am
Description
SECTION I - PAVING
Removing concrete and asphalt
sidewalk and driveway, complete as
specified
Name:
Address:
Address:
Address:
Unit Quantity
Square Yards 72
1
Carl Bowers & Sons Const Co Inc
N1844 Maloney Rd
Kaukauna, Wi 54130
Unit Price Unit Total
$20.00 $1,440.00
2
PTS Contractors Inc
4075 Eaton Road
Green Bay, WI 54311 -9340
Unit Price Unit Total
$8.50 $612.00
3
Wood Sewer & Excavating, Inc
E9238 Cty Rd X
New London, WI 54961
Unit Price Unit Total
$9.00 $648.00
1308
7' concrete pavement removal and
replacement, including sawing,
pavement ties, integral curb and
grading, terracing, and traffic control,
, complete
asspecified
Square Yards
382
$65,00
$24,830.00
$57.50
$21,965.00
$68.00
$25,976.00
1370
Terrace work at 440 West 7`'
A
Avenue complete asspecified
Lump Sum
1
$500.00
$500.00
$1,515.00
$1,515.00
$400.00
$400.00
1370
Terrace work at 452 West 7'
B 1
Avenue complete ass ecified
Lump Sum
1
$500.00
$500.00
$1,515.00
$1,515.00
$400.00
$400.00'
1370
C
Terrace work at 485 Windingbrook
Drive, complete asspecified
Lump Sum
1
$1,200.00
$1,200.00
52.535.00
$2.535.00
$650.001
$650.00
1370
Terrace work at 2405 and 2385
D
Abbey Avenue, complete as
specified
Lump Sum
1
$1,000.00
$1,OD0.00
$2,535.00
$2,535.00
$700.00
$700.00
1370
D
Terrace work at 1010 Mason Street,
I complete asspecified
Lump Sum
1
$500.00
$500.00
$1,515.00
$1,515.00
$400.00
$400.00
1500
4" concrete sidewalk with 3" CABC
and grading. complete asspecified
Square Yards
42
$45.00
$1,890.00
$41.40
$1,738.80
$41.00
$1,722.00
1510
6" concrete Sid ewalkldrivewaylramp
with 3" CABC and grading, complete
as specified
Square Yards
33
$46.00
$1,518.00
$45.25
$1,493.25
$45.00
$1,485.00
1540
Curb ramp detectable warning field
(naturallnon- painted), complete as
s ecified
Square Feet
1 8
$30.00
$240.00
$34.00
$272.00
$40.00
$320.00
1550
No. 4 reinforcing rods - deformed,
epoxy- coated, complete as specified
Linear Feet
220
1 $2.00
$440.00
$2.10
$462.00
$2.00
$440.00
1560
Drilied No. 4 sidewalk tie bars,
deformed, epoxy - coated, complete
asspecified
Each
70
$3.00
$210.00
$3.20
$224.00
$3.00
$210.00
1700
Sawing existing pavement, complete
asspecified
Linear Feet
160
$3.50
$560.00
$2.40
$384.00
$6.00
$960.00
1901
HMA Pavement Type E - 0.3,
complete ass specified
Square Yards
72.5
$50.00
$3,625.00
$37.50
$2,718.75
$40.00
$2,900.00
1950
Asphaltic pavement milling,
complete ass specified
Square Yards
72.5
$1.00
$72.50
$10.00
$725.00
$18.00
$1,305.00
SUB- TOTAL: SECTION I (BID ITEMS 1120 -1950) $38,525-501 1 $40,209.HL 1 $38,516.00
2030 Furnish and install 6" storm sewer,
complete asspecified Linear Feet 1 45 $70.00 $3,150.00 $86.60 $3,897.00 $52.
2036 Furnish and install 12" storm sewer,
complete as specified Linear Feet 1 420 $66.00 $27,720.00 $73.20 $30,744.00 $58.
BID TABULATION Corttrdct 19 -20
Mini Storm Sewers /Storm Laterals 1 2 3
BIDDERS
Name:
Carl Bowers R Sons Const Co Inc
PTS Contractors Inc
Wood Sewer & Excavadng, Inc
Address:
N1844 Maloney Rd
4075 Eaton Road
E9238 Cty Rd X
Address:
Kaukauna, WI 54130
Green Bay, WI 54311 -9340
New London, WI 54961
Bid Date: Tuesday, May 21, 2013
Address:
Bid Time: 10:30 am
Item
Description
Unit
Quantity
Unit Price
Unit Total
Unit Price
Unit Tetai
Unit Price
Unit Total
2280
Furnish and install 6" storm lateral,
complete asspecified
Linear Feet
245
$80.00
$19,600.00
$66,80
$16,366.00
$77.00
$18,865.00
2284
Fumish and install storm sewer
marker balls, complete as specified
Each
24
$20.00
$480.00
$29.00
$696.00
$22.00
$528.00
2286
Furnish and install clay dams,
complete asspecified
Each
1 14
$30.00
$420.00
$97.00
$1,358.00
$25.00
$350.00
2288
Furnish and install lateral inlet,
com lete asspecified
Each
5
$350.00
$1,750.00
$600.00
$3,000.00
$350.00
$1,750.00
2532
Fumish and install standard storm
manhole (4' diameter), complete as
:Vertical
specified
Feet
5.1
$450.00
$2,295.00
$580.001
$2,958.00
$480.00
$2,448.00
2534
Fumish and install standard storm
manhole (5' diameter), complete as
specified
Vertical Feei
1 4.75
$600.00
$2,850.00
$708.00
$3,363.00
$500.00
$2,375.00
2612
Fumish and install Type 1 inlet,
, complete asspecified
Each
2
$1,600.00
$3,200.00
$1,575.00
$3,150.00
$1,440.00
$2,880.00
2769
Storm manhole grouting, complete
ass ecified
Each
1
$1,000.00
$1,000.00
$2,780.00
$2,760.00
$3,200.00
$3,200.00
2800
Connect to existing storm sewer,
complete asspecified
Each
10
$160.00
$1,600.00
$230.00
$2,300.00
$200.00
$2,000.00
2802
Connect to existing storm lateral,
complete asspecified
Each
2
$65.00
$130.00
$179.00
$358.00
$100.00
$200.00
2808
Connect to existing inlet, complete
ass ecified
Each
2
$140.00
$280.00
$195.00
$390.00
$200.00
$400.00
2858
Fumish, install, maintain, and
remove Type D modified inlet
p rotection, complete asspecified
Each
130
$0.01
$1.30
$1.00
$130.00
$90.00
$11,700.00
1
SUB- TOTAL: SECTION 11 (BID ITEMS 2030 -2858) _ $64,476.301
1 $71,470.001 1 $73,396.00
GRAND TOTAL. - Section 1, 11 $103,001.80 $111,679.80 $111,912.00
CERTIFIED CHECKIBID BOND BOND BOND BOND