HomeMy WebLinkAbout0155487-Building (siding) k
� CITY OF OSHKOSH No 155487 `
�
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 2571 2573 VILLAGE LN Owner GERRITT J/DONNA KLEINHUIZEN REV TRUST Create Date 05/07/2013
Designer Contractor LETT SIDING&TRIM
Inspector Nicole Krahn
Category 042-Residential Siding Plan
Type � Building � Sign � Canopy � Fence � Raze �
Zoning R-3 Class of Const: Size
Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection I
Finished/Living Sq.Ft. Bedrooms _ Stories Canopies "
Garage Sq.Ft. Baths Signs
i
Foundation � Poured Concrete Q Floating Slab � Pier � Other
� Concrete Block � Post � Treated Wood
Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Not Required
Park Dedication Not Required #Dwelling Units 0 #Structures 0
Use/Nature DUPLEX/REPLACE VINYL SIDING ON THE FRONT OF THE BUILDING ONLY DUE TO HAIL DAMAGE-NO STRUCTURAL �
of Work CHANGES
- I
. _ �
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $1,450.00 Plan Approval $0.00 Permit Fee Paid $44.00 Park Dedication $0.00
Issued By:��rn Date 05/07l2013 Final/O.P. 00/00/0000 `=
Y
❑ Permit Voided'I Parcel Id# 1320511500
l
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work }
described in this permit application within an easement,the Ciry strongly urges the permit applicant to contact the easement
holder(s)and to secure any necessary approvals before starting such activity.
I have read and u rstand the a re enti ned information.
Signature ��y � Date '' '
� AgenUOwner �
Address 5737 CLEVEDON LN OSHKOSH _WI 54904 - 9729 Telephone Number 920-233-4144 €
�
�
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of �
Inspection (i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone '
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may `
continue if the inspection is not performed within two business days from the time the project is ready. �
�
�
,
f
k
City of Oslilcosh �
Inspection Services Division
POBox1130 �
Oshkosh,WI 54903-1130
Phone:(920)236-5050 � O.IHKOlH
Fax:(920)236-5084
Roofing & Siding Permit Application ON THE WATER
� Application(s)and fee(s)can be brought to City Hall,Room 205 or mailed to Inspection Services,PO Box 1128,
Oshkosh WI 54903-1128. Commencing work without permit(s)will result in fees being doubled or$100.00 plus the
normal permit fee,which ever is greater.
OR
Ifyou are a contractor DarticinatinQ in the Permit fee Account Svstem and have adequate funds check here -
if vou want this Drocessed through your account I—I
_ � r
JOB ADDRESS �
• �
OWNER
CONTRACTOR -B 7- � � 1"
I am the: ❑ Owner O �ontractor
USE CATEGORY ,
❑Single Family ❑Duplex ❑Multi-Fanuly C�2ental ❑Comuiercial ❑Industrial
Work being done:
ROOFING
❑Tear off and replace existing roofmg on�house,0 gazage
❑Replace wood decking
❑Add 1 layer of roofmg to the existing layer(s)on�house,�.garage
This work is being done due to❑Hail Dama?e ❑Other
SIDING
�Install siding on �house, J�garage
�eplacing vinyl with vinyl
t
❑Replacing steel or aluminum with vinyl(circle steel or aluminum)
❑Replacing witli
This work is being done due to�Iail Damage ❑Other
When siding'is done, one of the boges below must be checked:
1) ❑Electric—Existing Electric Meter,receptacle,lighting and Electric Service entrance alterations/modifications are being performed
bY
(Naa�e of Licensed Electric Contractor)
AND ❑Electric Installation Verification form is attached OR ❑Sepazate Elect Permit will be requested.
2) ❑Electric—Not Applicable because: ❑J Blocks previously installed. I�To outside lights. ❑Other
❑Install new or�Replace gutters
❑Install new or❑Replace downspouts
Other related work being done: (please note) �S�� ►'1 � l d
T
Value of the job $ l ��c � V (include fair market price for labor even if you are not paying for labor) 03/02