Loading...
HomeMy WebLinkAbout06. 13-224MAY 14, 2013 13 -224 RESOLUTION (CARRIED 6 -0 LOST LAID OVER WITHDRAWN PURPOSE: APPROVAL OF PROFESSIONAL SERVICES AGREEMENT FOR PERMITTING, CONSTRUCTION DOCUMENTS, BIDDING AND CONSTRUCTION MANAGEMENT FOR PROPOSED PARKING LOT IMPROVEMENTS AT RIVERSIDE PARK/ AECOM ($163,415.00) INITIATED BY: TRANSPORTATION DEPARTMENT BE IT RESOLVED by the Common Council of the City of Oshkosh that the proper City officials are hereby authorized to enter into and take those steps necessary to implement an appropriate professional services agreement with AECOM Technical Services for permitting, construction documents, bidding and construction management services related to proposed parking lot improvements at Riverside Park in the amount of one hundred sixty -three thousand four hundred fifteen dollars ($163,415.00) BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 323 - 0130 -7216- 06241 Property Fund — City Hall Parking Lot Improvements (0 CYWO H City of Oslilcosh - Transportation Department aN THE WATER 926 Dempsey Trail, Oshkosh, WI 54902 (920) 232 -5342 (920) 232 -5343 fax MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Christopher Strong, P.E., Director of Transportation DATE: May 8, 2013 RE: APPROVAL OF PROFESSIONAL SERVICES AGREEMENT FOR PERMITTING, CONSTRUCTION DOCUMENTS, BIDDING AND CONSTRUCTION MANAGEMENT FOR PROPOSED PARKING LOT IMPROVEMENTS AT RIVERSIDE PARK / AECOM ($163,415) Background The Riverside Park parking lot, located on the east side of the Oshkosh Convention Center, provides public parking for the convention center, the Leach Amphitheater and Riverside Park. In 2010, a consultant retained by the City assigned the lot a PASER rating of 3 for its pavement condition, noting the exposed pilings in the southern portion of the lot, pavement cracking, and drainage problems. Based on this assessment, the consultant recommended that the Riverside Lot be reconstructed. In 2012, the City entered into an engineering services agreement with AECOM to develop several candidate parking lot layouts for the lot, with the goal of developing a layout that would address current deficiencies in the lot. Through AECOM's work, the cost of ultimate reconstruction was estimated at approximately $2.5 million. Consequently, AECOM developed a phased construction approach that would allow the northern part of the lot to be reconstructed separately from the southern part of the lot. In addition to improving the financial feasibility of reconstructing the lot, this approach would minimize the amount of disruption to public parking during the construction process. Since the time these cost estimates were submitted to the City, staff have worked to refine the lot's design to address the lot's footprint, location and design of dumpster enclosures and truck circulation patterns. Staff requested a proposal from AECOM to make these minor design adjustments, to advance the design concepts toward bidding, to support the bidding process, and then to provide construction management services. Staff did not request proposals from other consultants as AECOM's previous work along the riverfront has given them a unique understanding of the design challenges that must be addressed to build a parking facility that will last for 50 or more years. City of Oshkosh — Department of Transportation Approval of Professional Services Agreement for Permitting, Construction Documents, Bidding and Construction Managemen for Proposed Parking Lot Improvements at Riverside Park / AECOM ($163,415) Analysis The proposal accurately reflects the City's goals with reconstructing this lot. Under AECOM's proposed project schedule, construction bids will be opened in July, which will allow staff to determine to what extent the lot can be reconstructed in this year. Assuming the bids for the first phase of construction (the northern part of the lot) are favorable, construction will occur in the late summer to early fall. An alternate bid item will cover the second phase of construction, which will allow work to start on the southern portion of the lot as funding is available. Fiscal Impact The proposed fee is $163,415. This project would be paid for out of the Parking Lots Improvement line item in the Capital Improvement Program (CIP), funded at $350,000 per year in each of the 2012 and 2013 CIPs. Expenditures to date from the 2012 CIP allotment have included approximately $66,000 in AECOM's earlier design work along with streetlighting purchases for the City Hall parking lot. Assuming the City pays the full fee, approximately $471,000 will be available for construction of parking lot improvements. Depending on how bids turn out, this may be sufficient for completion of the first phase of construction in 2013. The proposed fee could be lowered slightly by limiting AECOM's scope to only the first phase of the lot. However, staff believes having an integrated design from the beginning will help to lower the overall long -term costs of construction. Recommendation I recommend the Common Council approve this contract with AECOM for permitting, construction documents, bidding and construction management services for proposed parking lot improvements at Riverside Park. Respectfully submitted, /hr Strong, P.E. Director of Transportation Approved: Mark A. Rohloff City Manager City of Oshkosh — Department of Transportation