HomeMy WebLinkAbout02. 13-223MAY 14, 2013 13 -223 RESOLUTION
(CARRIED 6 -0 LOST LAID OVER WITHDRAWN )
PURPOSE: APPROVAL OF FINAL RESOLUTION FOR SPECIAL
ASSESSMENTS / STORM SEWER LATERALS / VARIOUS
LOCATIONS
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
WHEREAS, the Common Council of the City of Oshkosh held a public hearing on
the 14 day of May, 2013, at 6:00 p.m. for the purpose of hearing all interested persons
concerning the preliminary resolution and report of the City Manager (Board of Public
Works) on the proposed improvements as listed below, pursuant to the initial resolution
adopted April 9, 2013, by the Oshkosh Common Council of the following named streets:
STORM SEWER LATERALS:
440 West 7 th Avenue
452 West 7 th Avenue
2385 Abbey Avenue
1833 Doemel Street
931 Dove Street
2207 White Swan Drive
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of
Oshkosh as follows:
1. That the report of the City Manager, acting as the Board of Public Works,
pertaining to the construction of the above described public improvements, including plans
and specifications therefor, is hereby adopted and approved with the following
modifications:
a.
b.
C.
2. That the action of the City Manager in advertising for bids and to carry out the
work of such improvements in accordance with the reports of the City Manager and in
accordance with the said resolution heretofore adopted, is hereby approved, ratified and
confirmed.
MAY 14, 2013 13 -223 RESOLUTION
CONT'D
3. That payment for said improvements be made by assessing the cost to the
property benefited as indicated in said report, except as modified herein.
4. Assessments shown on the report represent an exercise of the police power and
have been determined on a reasonable basis and are hereby confirmed.
5. That the assessments for all projects included in said report are hereby
combined as a single assessment but any interested property owners shall be entitled to
object to each assessment separately or all assessments jointly for any purpose or
purposes.
6. That the assessments may be paid in cash, or in installments pursuant to Section
25 -83 thru 25 -89 of the Oshkosh Municipal Code, said deferred payments to bear interest
at the rate of six percent (6 %) per annum on the unpaid balance. The City Clerk shall
publish an installment assessment notice in accordance with Section 66.0715(3)(e) of the
Wisconsin Statutes in the official newspaper of the City.
7. The City Clerk is directed to publish this resolution in the OSHKOSH DAILY
NORTHWESTERN, the official newspaper of the City.
8. The City Clerk is further directed to mail a copy of this resolution to every
property owner whose name appears on the assessment roll whose post office address is
known or can with reasonable diligence be ascertained.
PAMELA R. LIBRIG
May 3, 2013
Dear Property Owner.
Please find enclosed the following documents for your information and review:
A letter of explanation from Public Works Assistant Director Steven Gohde.
2 The Initial Resolution adopted by the Oshkosh Common Council, which began the
process for the improvement(s) adjacent to your property.
3. Notice of Public Hearing to be held by the Oshkosh Common Council on May 14, 2013
regarding assessments, which will be set with the adoption of the final resolution, also
scheduled for adoption on May 14, 2013.
4_ Special assessment payment plan options explaining the payment choices after
Contract No. 13 -20 is certified as complete — payment choice or payment is not accepted at
this time.
5. Assessment sheet indicating properties involved in the proposed project, the property
footage, price per foot and estimated total assessment to the property.
If you wish to appear before the Council before the final resolution is adopted to proceed with
the construction, please refer to the "Notice of Public Hearing" enclosed.
If you have any questions regarding the above listed documents, please contact the Public
Works Department (236 -5065) or the City Clerk (236 - 5011), Monday through Friday, 8:00
a.m, until 4:30 p.m.
Sincerely,
CITY OF OSHKOSH
U-
PAMELA R. UBRIG
CITY CLERK
City Clerk
ANGELA J. JOECKEL
Deputy City Clerk
CITY HALL
OfHKQIH
215 Church Avenue
P.O. Box 1130
ON THE WATER
Oshkosh, WI
54902 -1130
May 3, 2013
Dear Property Owner.
Please find enclosed the following documents for your information and review:
A letter of explanation from Public Works Assistant Director Steven Gohde.
2 The Initial Resolution adopted by the Oshkosh Common Council, which began the
process for the improvement(s) adjacent to your property.
3. Notice of Public Hearing to be held by the Oshkosh Common Council on May 14, 2013
regarding assessments, which will be set with the adoption of the final resolution, also
scheduled for adoption on May 14, 2013.
4_ Special assessment payment plan options explaining the payment choices after
Contract No. 13 -20 is certified as complete — payment choice or payment is not accepted at
this time.
5. Assessment sheet indicating properties involved in the proposed project, the property
footage, price per foot and estimated total assessment to the property.
If you wish to appear before the Council before the final resolution is adopted to proceed with
the construction, please refer to the "Notice of Public Hearing" enclosed.
If you have any questions regarding the above listed documents, please contact the Public
Works Department (236 -5065) or the City Clerk (236 - 5011), Monday through Friday, 8:00
a.m, until 4:30 p.m.
Sincerely,
CITY OF OSHKOSH
U-
PAMELA R. UBRIG
CITY CLERK
CITY HALL
215 Church Avenue
P.O. Box 1130
Oshkosh, 903 -1130 City of Oshkosh
—
OfHKOfH
May 3, 2013
Subject:, Assessments for Storm Sewer Laterals (New and Relay) and Surface Drains
Contract 13 -20
To Property Owners on:
#1
➢ WEST 7 l AVENUE
➢ ABBEY AVENUE
➢ WHITE SWAN DRIVE
➢ DOVE STREET
A public hearing is scheduled for Tuesday, May 14, 2013, at 6 :00 p.m. in the Common Council Chamber of the
Oshkosh City Hall to consider the following improvements to your street: storm sewer laterals (new and relay) and
surface drains and the levy of special assessments that partially cover the cost of the improvements. Assessments are
not due until the project is certified as complete and then can be paid by any one of the plans as outlined by the City
Clerk's information on payment plan options. Based upon the City of Oshkosh assessment policy, the assessable
portions of the project have been identified and are outlined on the attached assessment worksheet(s). The final cost
will not increase above the estimated total without another public hearing. Questions in regard to payment of Special
Assessments can be answered by calling the City Clerk's office at (920)236 -5011. Questions in regard to the
construction project in general can be answered by calling the Department of Public Works Engineering Division at
(920)236 -5065.
The sequence of construction has not yet been scheduled with a contractor. Residents will be notified approximately
one week before construction will begin on a particular street. All work within this contract is scheduled to be
completed by the end of September 2013.
The project construction will consist of the following elements: relay or installation of storm sewer laterals and
surface drains, as needed, along the project to accommodate the drainage needs for the street and the adjacent
properties. If you know of any underground wires and/or piping, (examples: invisible electric fence, conduit for
exterior lighting, irrigation system, -etc.) on your property near the sidewalk and driveway, please contact the
Engineering Division as soon as possible. Prior to the completion of the project, all disturbed areas will be topsoiled, -
seeded, and covered with erosion mat (the property owner is responsible for watering the newly vegetated
areas). The matting placed over the seed is biodegradable; please do not remove the mat because it serves as
mulch for the new grass. Please set your lawn mower to the highest setting when mowing the new grass areas for
the first few mowings.
As part of the construction, a storm lateral will be installed at your lot to the property line and an 8" diameter drain
with a slotted drain cover will be placed approximately one (1) foot off the sidewalk into your yard. The storm
sewer lateral and drain will allow you to direct drainage and/or sump pump hoses to this location. This drain is
connected to the storm sewer. system and drains directly to local streams and lakes. The lateral is to be used for
"clear water" only. "Clear water" is typically groundwater discharged by a sump pump or runoff from precipitation
(i.e. rainfall or snow melt). Do not place pet waste, yard waste, or other waste material into the storm sewer
system. In the event conditions on the property prevent the installation of the drain (a retaining wall, for example), a
drain will not be installed. The storm sewer lateral will be stubbed underground to the property line. You will be
receiving additional information about the storm sewer lateral and drain. The drain is part of your private lateral and
will be yours to maintain. The drain will have a fabric filter installed as a part of the construction. Please leave the
Pagel of 2
I.1Engineering113 -20 Mi ni Storm Sms - Stnrm LaleralsTroject_In Formation \Correspandencc\Lellers\13 -20 Assessments Letter 4 1_5.3- 13_do"
a �)
y!r'.
filter in place until the grass surrounding the drain is well established. The fabric will prevent dirt and debris from
filling the pipe until the grass is established. Commercial properties will receive a larger diameter storm sewer
lateral stubbed to the property line.
Although terrace trees may need to be removed at specific locations, they will be preserved as much as possible.
Property owners at locations where a tree needs to be removed will receive advance notice of the removal and
replacement options. Roots and branches may be cut to allow for paving operations. Cutting and pruning will either
be done by, or under the direction of, the City Forester.
If you have any questions on the proposed assessments or the project construction, you can contact the Public Works
Engineering Division at (920)236 -5065.
Sincerely,
Steven M. Gohde, P.E.
Assistant Director of Public Works
SMGltit
Enclosures
Page 2 of 2
NEn,-iuerina113 -20 Mini Storm S}ws- Storm Laterals\ Project_ Inform3tion \Correspooden"V- elters%13 -20 Assessments Leller#l_5-3-13 docx
ruL
APRIL 9, 2013
{CARRIED 6 -0 LOST
PURPOSE
INITIATED BY:
13 -173
IW,1I9141T/0:4
RESOLUTION
WITHDRAWN
AMEND INITIAL RESOLUTION FOR SPECIAL ASSESSMENTS 1
STORM SEWER LATERALS 1 VARIOUS LOCATONS
DEPARTMENT OF PUBLIC WORKS
WHEREAS, an initial resolution for special assessments for storm sewer laterals
for various locations was adopted by Resolution 13 -131 on March 26, 2013. One of the
properties has privately installed a storm sewer lateral and another property was
inadvertently misidentified in the resolution.
NOW, THEREFORE, BE IT RESOLVED BY the Common Council of the City of
Oshkosh as follows:
1. The Common Council hereby declares its intention to exercise its police
power under Section 66.0703 and 66.0705 of the Wisconsin Statutes to levy special
assessments upon property within the following described areas for benefits conferred
upon such property by improving the following:
Storm Sewer Laterals:
440 West 7 th Avenue
452 West 7 th Avenue
2385 Abbey Avenue
1833 Doemel Street
931 Dove Street
2207 White Swan Drive
2. The total amount assessed against such district shall not exceed the total
cost of the improvements and the amount assessed against any parcel shall not be
greater than the benefits accrued thereto from said improvements.
3. The assessments against any parcel may be paid according to the
provisions of Section 25 -83 through 25 -89 of the Oshkosh Municipal Code.
4. The governing body determines that the improvements constitute an
exercise of the police power for the health, safety, and general welfare of the
municipality and its inhabitants.
APRIL 9, 2013
13 -173 RESOLUTION
CONT'D
5. The Board of Public Works is directed to prepare a report consisting of:
(a) Final plans and specifications for said improvements.
(b) An estimate of the entire cost of the proposed work or
improvements.
(c) An estimate as' to each parcel of property within the assessment
district of:
(1) The assessment of benefits to be levied for each
improvement.
(2) The damages to be awarded for property taken or damages
by each improvement.
(3) The net amount of benefits over damages or the net amount
of damages over benefits for each improvement.
(4) The total assessment against each parcel
Upon completion of such report, the Board of Public Works is directed to file a copy
thereof in the City Clerk's Office for public inspection.
6. Upon receiving the report of the Board of Public Works, the City Clerk is
directed to give notice of a public hearing on such reports as specified in Section
66.0703(7)(a) of the Wisconsin Statutes. The hearing shall be held before the Common
Council at the Council Chambers, Room 406 in the City Hall at a time set by the Clerk in
accordance with the Wisconsin Statutes. The assessment against any parcel may be
paid in cash, paid with the first property tax installment, or in ten (10) installments if the
total amount of the assessment is greater than five hundred dollars ($500.00) or fifteen
(15) installments if the total amount of the assessment is greater than one thousand
dollars ($1000.00).
7. The installation of said street improvements shall be accomplished
according to the provisions of Section 25 -3 through 25 -11 of the Oshkosh Municipal
Code.
FIGI
Ummm
NOTICE OF PUBLIC HEARING
Office of the City Clerk, City of Oshkosh, Winnebago County, Wisconsin:
Please take notice that the City Council of the City of Oshkosh has declared its intention to
exercise its power under Section 66.0703(7)(a) of the Wisconsin Statutes, to levy assessments
upon property for benefits conferred upon such property by providing the following improvements
fronting upon the following described streets:
CONTRACT NO 1320
STORM SEWER LATERALS
440 West 7 th Avenue
452 West 7 th Avenue
2385 Abbey Avenue
1833 Doemel Street
931 Dove Street
2207 White Swan Drive
The report of the Public Works Director and City Manager showing proposed plans and
specifications, estimated costs of improvements, proposed assessments and awards of
damages is on file in the Office of the City Clerk and can be inspected there on any business day
between the hours of 8 :00 a.m. and 4:30 p.m.
Notification that the City Manager (Board of Public Works) and City Council will hear all persons
interested or their agents or attorneys concerning the matters in the preliminary resolutions
authorizing awards of damages at 6:00 p.m. in the Council Chambers in the City Hall, Oshkosh,
Wisconsin on MAY 14, 2013.
All objections will be considered at said hearing and thereafter the amount of assessment will be
finally determined.
CITY OF OSHKOSH
PAMELA R. UBRIG
PUBLISH: 5/4/2013 CITY CLERK
r■ I
SPECIAL ASSESSMENT PAYMENT PLAN OPTIONS
AFTER
CONTRACT NO. 13 -20 IS CERTIFIED AS COMPLETE
CONTRACT NO 13 -20 WILL CONSIST OF:
STORM SEWER LATERALS
440 West 7 th Avenue
452 West 7 th Avenue
2385 Abbey Avenue
1833 Doemel Street
931 Dove Street
2207 White Swan Drive
Included in this mailing, is an estimated amount (quantities and costs) of the special assessment
(sheet #5) against your property or properties. A statement of the same is on file in the office of the
City Clerk. Once Contract No. 13 -20 is certified as complete by the Public Works Department, the
final amount (quantities and costs) of the special assessment against your property or properties
will be mailed to you. At that time you will also receive the paperwork to select a payment choice
for the special assessments. PAYMENT CHOICE OR PAYMENT IS NOT ACCEPTED AT THIS
TIME.
THE PAYMENT OPTIONS SHEET YOU WILL RECEIVE AFTER THE CONTRACT IS CERTIFIED
AS COMPLETE WILL HAVE THE FOLLOWING OPTIONS:
INVOICE - PAYMENT WITHIN 30 DAYS
If you choose this option, the City of Oshkosh will then send you a special assessment invoice and
you must make payment within thirty days of that notice.
If the payment is not made within thirty days after receiving the special assessment invoice, 6%
interest accrues from the date of notification.
If after making this selection, the property owner fails to make payment to the City Treasurer; the
entire amount including interest will be placed on the next property tax bill.
TOTAL ASSESSMENT ON NEXT TAX BILL IN FULL
Property owners may elect to pay 100% of the assessment on the next designated real estate
property tax bill, without interest. The total amount of the assessment will be included on and
payable in conjunction with the next designated property tax bill.
TEN ANNUAL INSTALLMENT PAYMENTS ON PROPERTY TAX BILL (ASSESSMENT MUST BE
IN EXCESS OF $500.00)
The amount of the assessment will be placed on the property tax bill with interest at 6% on the
unpaid balance per year over the ten- (10) year period. The annual assessment payment and
interest will be included in each year's tax bill payment. The assessment balance may be paid in
full at any time during the ten -year period, with interest pro -rated to the month of payment. (Applies
to assessments in excess of $500.00.)
FIFTEEN ANNUAL INSTALLMENT PAYMENTS ON PROPERTY TAX BILL (ASSESSMENT
MUST BE IN EXCESS OF $1,000.00)
The amount of the assessment will be placed on the property tax bill with interest at 6% on the
unpaid balance per year over the fifteen- (15) year period. The annual assessment payment and
interest will be included in each year's tax bill payment. The assessment balance may be paid in
full at any time during the fifteen -year period, with interest pro -rated to the month of payment.
(Applies to assessments in excess of $1,000.00.)
CITY OF OSHKOSH
PAMELA R. UBRIG
CITY CLERK
N
n
l i
a
U
I
W. 7TH AVE.
i
PAGE 1 OF 2
flaname: 440,452 W 7th Ave.dw
CITY OF OSHKOSH
SMRM LATERAL AsMMtxr
ENGINEERING DIVISION
CONTRACT NO. DRAWN (NEST SEVENTH AVENUE
13 -20 04-01 -2013
GRAPHIC ° 23 70 100 440, 452. W. 7TH AVENUE
SCALE: (IN FEET)
I PARCEL I.D. DESCRIPTION OWNER NEW 6" STORM I
LATERAL
in
09 -0561 -0000
2013 ASSESSMENT RATES-.
I��C�IC /�;1;1�►1
NEW STORM SEWER LATERAL = $750.00 EACH
TOTALS
$1,500.00
ENGINEERING DIVISION
CONTRACT NO. DRAWN
13.20 402013
WARD REVISED
PAGE 2OF2
STORM SEWER LATERAL
SPECIAL ASSESSMENT
WEST 7TH AVENUE
440, 452 W. 7TH AVE.
N
3
n
I
1 i
I
ABBEY AVE.
2385
D
J
W
Li
Z
W
W
Er
C9
KINCAID AVE.
PAGE 9 OF 2
filename: 2385 Abbey Ave.dw
CITY OF OSHKOSH
ENGINEERING DIVISION STOW LATERAL ASSESSMENT
CONTRACT N0. DRAWN ABBEY AVENUE
13 -20 04 -01 -2013
GRAPHIC a u °0 100 2385 ABBEY AVENUE
SCALE: (IN FEET)
I PARCEL I.D. DESCRIPTION OWNER NEW 6" STORM I
LATERAL
06- 1399 -1400 2385
2013 ASSESSMENT RATES:
TOTALS
$750.00
PAGE 2OF2
SPECIAL ASSESSMENT
NEW STORM SEWER LATERAL WITH DRAIN = $750.00 EACH
ENGINEERING DIVISION
CONTRACT NO. DRAWN
13 -20 4/2/2013
WARD REVISED
ABBEY AVENUE
2385 ABBEY AVE.
LARK ST.
La
z
o
J m
91
DOVE ST.
i
I
I I
PAGE 1 OF 2
Rename: 931 Dove SLew
CITY OF OSHKOSH s1oe� u1 AS4�IENT
ENGINEERWO DIVISION
CONTRACT NO. DRAWN
13 -20 DOVE STREET
Oh-01 -2013
ORAPH4 931 DOVE STREET
SCALE: (IN FEET) �
PARCEL I.D.
16- 0184.0000
DESCRIPTION
OWNER
NEW 6" STORM
LATERAL
$750.00
TOTALS $750.00
931
2013 ASSESSMENT RATES:
NEW STORM SEWER LATERAL = $750.00 EACH
CITY OF OSHKOSH
ENGINEERING DIVISION
CONTRACT NO. DRAWN
13-20 4/2/2013
WARD REVISED
16TH
PAGE 2OF2
SPECIAL ASSESSMENT
DOVE STREET
931 DOVE ST.
FAiRMEW ST.
a
Y
U
O
O
D
Ld
1833
DOEMEL ST.
h
I
PAGE 1 OF 2
i
filename: 1833 Doemel S! -dw
CITY OF OSHKOSH
ENGINEERING DIVISION STORY LATERAL AS5691tNT
CONTRACT N0. I DRAWN
aOEMEL STREET
13 -20 04-01 -2013
GRAPHIC 0� 23 50 100
1833 DOEMEL SilifFP
SCALE: (IN FEED
I PARCEL I.D. DESCRIPTION OWNER NEW 6" STORM I
LATERAL
15- 1481 -2300
2013 ASSESSMENT RATES.
NEW STORM SEWER LATERAL = $750.00 EACH
ENGINEERING DIVISION
CONTRACT NO. DRAWN
13.20 4!212013
WARD REVISED
TOTALS
$750.00
fJB7��i7�:
SPECIAL ASSESSMENT
DOEMEL STREET
1833 DOEMEL ST.
N
n
SOUTH
!
ASYLUM
I
BAY
WH17F SWAN
DR.
2207
H
�
V}
�
J
}"
LLI
Z
- -- ............................... m
O
Ld
O
0.
O
a
O
Z
PAGE 1 OF 2
-
filaname: 2207 Mite Swan Dr.d.
CITY OF OSHKOSH
ENGINEERING DIMSFON
STOW LATERAL A SSESSM EM
CONTRACT NO. DRAWN
13 -20 04-02 -2013
WHITE SWAN DRIVE
GRAPHIC a 25 30 100
2207 WHI7E SWAN DRIVE
SCALE: (IN FEET)
PARCEL I.D. DESCRIPTION OWNER NEW 6" STORM
LATERAL
15- 2160 -0000 2207 WHITE SWAN DR MAJDALANI MR/MRS GHASSAN J $ 750.00
TOTALS $750.00
PAGE 2 OF 2
2013 ASSESSMENT RATES:
CITY OF OSHKOSH STORM SEWER LATERAL
NEW STORM SEWER LATERAL = $750.00 EACH ENGINEERING DIVISION SPECIAL ASSESSMENT
CONTRACT NO. DRAWN
13-2a 41212013 WHITE SWAN DRIVE
WARD REVISED 2207 WHITE SWAN DR.
15TH