Loading...
HomeMy WebLinkAbout02. 13-223MAY 14, 2013 13 -223 RESOLUTION (CARRIED 6 -0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVAL OF FINAL RESOLUTION FOR SPECIAL ASSESSMENTS / STORM SEWER LATERALS / VARIOUS LOCATIONS INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the Common Council of the City of Oshkosh held a public hearing on the 14 day of May, 2013, at 6:00 p.m. for the purpose of hearing all interested persons concerning the preliminary resolution and report of the City Manager (Board of Public Works) on the proposed improvements as listed below, pursuant to the initial resolution adopted April 9, 2013, by the Oshkosh Common Council of the following named streets: STORM SEWER LATERALS: 440 West 7 th Avenue 452 West 7 th Avenue 2385 Abbey Avenue 1833 Doemel Street 931 Dove Street 2207 White Swan Drive NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh as follows: 1. That the report of the City Manager, acting as the Board of Public Works, pertaining to the construction of the above described public improvements, including plans and specifications therefor, is hereby adopted and approved with the following modifications: a. b. C. 2. That the action of the City Manager in advertising for bids and to carry out the work of such improvements in accordance with the reports of the City Manager and in accordance with the said resolution heretofore adopted, is hereby approved, ratified and confirmed. MAY 14, 2013 13 -223 RESOLUTION CONT'D 3. That payment for said improvements be made by assessing the cost to the property benefited as indicated in said report, except as modified herein. 4. Assessments shown on the report represent an exercise of the police power and have been determined on a reasonable basis and are hereby confirmed. 5. That the assessments for all projects included in said report are hereby combined as a single assessment but any interested property owners shall be entitled to object to each assessment separately or all assessments jointly for any purpose or purposes. 6. That the assessments may be paid in cash, or in installments pursuant to Section 25 -83 thru 25 -89 of the Oshkosh Municipal Code, said deferred payments to bear interest at the rate of six percent (6 %) per annum on the unpaid balance. The City Clerk shall publish an installment assessment notice in accordance with Section 66.0715(3)(e) of the Wisconsin Statutes in the official newspaper of the City. 7. The City Clerk is directed to publish this resolution in the OSHKOSH DAILY NORTHWESTERN, the official newspaper of the City. 8. The City Clerk is further directed to mail a copy of this resolution to every property owner whose name appears on the assessment roll whose post office address is known or can with reasonable diligence be ascertained. PAMELA R. LIBRIG May 3, 2013 Dear Property Owner. Please find enclosed the following documents for your information and review: A letter of explanation from Public Works Assistant Director Steven Gohde. 2 The Initial Resolution adopted by the Oshkosh Common Council, which began the process for the improvement(s) adjacent to your property. 3. Notice of Public Hearing to be held by the Oshkosh Common Council on May 14, 2013 regarding assessments, which will be set with the adoption of the final resolution, also scheduled for adoption on May 14, 2013. 4_ Special assessment payment plan options explaining the payment choices after Contract No. 13 -20 is certified as complete — payment choice or payment is not accepted at this time. 5. Assessment sheet indicating properties involved in the proposed project, the property footage, price per foot and estimated total assessment to the property. If you wish to appear before the Council before the final resolution is adopted to proceed with the construction, please refer to the "Notice of Public Hearing" enclosed. If you have any questions regarding the above listed documents, please contact the Public Works Department (236 -5065) or the City Clerk (236 - 5011), Monday through Friday, 8:00 a.m, until 4:30 p.m. Sincerely, CITY OF OSHKOSH U- PAMELA R. UBRIG CITY CLERK City Clerk ANGELA J. JOECKEL Deputy City Clerk CITY HALL OfHKQIH 215 Church Avenue P.O. Box 1130 ON THE WATER Oshkosh, WI 54902 -1130 May 3, 2013 Dear Property Owner. Please find enclosed the following documents for your information and review: A letter of explanation from Public Works Assistant Director Steven Gohde. 2 The Initial Resolution adopted by the Oshkosh Common Council, which began the process for the improvement(s) adjacent to your property. 3. Notice of Public Hearing to be held by the Oshkosh Common Council on May 14, 2013 regarding assessments, which will be set with the adoption of the final resolution, also scheduled for adoption on May 14, 2013. 4_ Special assessment payment plan options explaining the payment choices after Contract No. 13 -20 is certified as complete — payment choice or payment is not accepted at this time. 5. Assessment sheet indicating properties involved in the proposed project, the property footage, price per foot and estimated total assessment to the property. If you wish to appear before the Council before the final resolution is adopted to proceed with the construction, please refer to the "Notice of Public Hearing" enclosed. If you have any questions regarding the above listed documents, please contact the Public Works Department (236 -5065) or the City Clerk (236 - 5011), Monday through Friday, 8:00 a.m, until 4:30 p.m. Sincerely, CITY OF OSHKOSH U- PAMELA R. UBRIG CITY CLERK CITY HALL 215 Church Avenue P.O. Box 1130 Oshkosh, 903 -1130 City of Oshkosh — OfHKOfH May 3, 2013 Subject:, Assessments for Storm Sewer Laterals (New and Relay) and Surface Drains Contract 13 -20 To Property Owners on: #1 ➢ WEST 7 l AVENUE ➢ ABBEY AVENUE ➢ WHITE SWAN DRIVE ➢ DOVE STREET A public hearing is scheduled for Tuesday, May 14, 2013, at 6 :00 p.m. in the Common Council Chamber of the Oshkosh City Hall to consider the following improvements to your street: storm sewer laterals (new and relay) and surface drains and the levy of special assessments that partially cover the cost of the improvements. Assessments are not due until the project is certified as complete and then can be paid by any one of the plans as outlined by the City Clerk's information on payment plan options. Based upon the City of Oshkosh assessment policy, the assessable portions of the project have been identified and are outlined on the attached assessment worksheet(s). The final cost will not increase above the estimated total without another public hearing. Questions in regard to payment of Special Assessments can be answered by calling the City Clerk's office at (920)236 -5011. Questions in regard to the construction project in general can be answered by calling the Department of Public Works Engineering Division at (920)236 -5065. The sequence of construction has not yet been scheduled with a contractor. Residents will be notified approximately one week before construction will begin on a particular street. All work within this contract is scheduled to be completed by the end of September 2013. The project construction will consist of the following elements: relay or installation of storm sewer laterals and surface drains, as needed, along the project to accommodate the drainage needs for the street and the adjacent properties. If you know of any underground wires and/or piping, (examples: invisible electric fence, conduit for exterior lighting, irrigation system, -etc.) on your property near the sidewalk and driveway, please contact the Engineering Division as soon as possible. Prior to the completion of the project, all disturbed areas will be topsoiled, - seeded, and covered with erosion mat (the property owner is responsible for watering the newly vegetated areas). The matting placed over the seed is biodegradable; please do not remove the mat because it serves as mulch for the new grass. Please set your lawn mower to the highest setting when mowing the new grass areas for the first few mowings. As part of the construction, a storm lateral will be installed at your lot to the property line and an 8" diameter drain with a slotted drain cover will be placed approximately one (1) foot off the sidewalk into your yard. The storm sewer lateral and drain will allow you to direct drainage and/or sump pump hoses to this location. This drain is connected to the storm sewer. system and drains directly to local streams and lakes. The lateral is to be used for "clear water" only. "Clear water" is typically groundwater discharged by a sump pump or runoff from precipitation (i.e. rainfall or snow melt). Do not place pet waste, yard waste, or other waste material into the storm sewer system. In the event conditions on the property prevent the installation of the drain (a retaining wall, for example), a drain will not be installed. The storm sewer lateral will be stubbed underground to the property line. You will be receiving additional information about the storm sewer lateral and drain. The drain is part of your private lateral and will be yours to maintain. The drain will have a fabric filter installed as a part of the construction. Please leave the Pagel of 2 I.1Engineering113 -20 Mi ni Storm Sms - Stnrm LaleralsTroject_In Formation \Correspandencc\Lellers\13 -20 Assessments Letter 4 1_5.3- 13_do" a �) y!r'. filter in place until the grass surrounding the drain is well established. The fabric will prevent dirt and debris from filling the pipe until the grass is established. Commercial properties will receive a larger diameter storm sewer lateral stubbed to the property line. Although terrace trees may need to be removed at specific locations, they will be preserved as much as possible. Property owners at locations where a tree needs to be removed will receive advance notice of the removal and replacement options. Roots and branches may be cut to allow for paving operations. Cutting and pruning will either be done by, or under the direction of, the City Forester. If you have any questions on the proposed assessments or the project construction, you can contact the Public Works Engineering Division at (920)236 -5065. Sincerely, Steven M. Gohde, P.E. Assistant Director of Public Works SMGltit Enclosures Page 2 of 2 NEn,-iuerina113 -20 Mini Storm S}ws- Storm Laterals\ Project_ Inform3tion \Correspooden"V- elters%13 -20 Assessments Leller#l_5-3-13 docx ruL APRIL 9, 2013 {CARRIED 6 -0 LOST PURPOSE INITIATED BY: 13 -173 IW,1I9141T/0:4 RESOLUTION WITHDRAWN AMEND INITIAL RESOLUTION FOR SPECIAL ASSESSMENTS 1 STORM SEWER LATERALS 1 VARIOUS LOCATONS DEPARTMENT OF PUBLIC WORKS WHEREAS, an initial resolution for special assessments for storm sewer laterals for various locations was adopted by Resolution 13 -131 on March 26, 2013. One of the properties has privately installed a storm sewer lateral and another property was inadvertently misidentified in the resolution. NOW, THEREFORE, BE IT RESOLVED BY the Common Council of the City of Oshkosh as follows: 1. The Common Council hereby declares its intention to exercise its police power under Section 66.0703 and 66.0705 of the Wisconsin Statutes to levy special assessments upon property within the following described areas for benefits conferred upon such property by improving the following: Storm Sewer Laterals: 440 West 7 th Avenue 452 West 7 th Avenue 2385 Abbey Avenue 1833 Doemel Street 931 Dove Street 2207 White Swan Drive 2. The total amount assessed against such district shall not exceed the total cost of the improvements and the amount assessed against any parcel shall not be greater than the benefits accrued thereto from said improvements. 3. The assessments against any parcel may be paid according to the provisions of Section 25 -83 through 25 -89 of the Oshkosh Municipal Code. 4. The governing body determines that the improvements constitute an exercise of the police power for the health, safety, and general welfare of the municipality and its inhabitants. APRIL 9, 2013 13 -173 RESOLUTION CONT'D 5. The Board of Public Works is directed to prepare a report consisting of: (a) Final plans and specifications for said improvements. (b) An estimate of the entire cost of the proposed work or improvements. (c) An estimate as' to each parcel of property within the assessment district of: (1) The assessment of benefits to be levied for each improvement. (2) The damages to be awarded for property taken or damages by each improvement. (3) The net amount of benefits over damages or the net amount of damages over benefits for each improvement. (4) The total assessment against each parcel Upon completion of such report, the Board of Public Works is directed to file a copy thereof in the City Clerk's Office for public inspection. 6. Upon receiving the report of the Board of Public Works, the City Clerk is directed to give notice of a public hearing on such reports as specified in Section 66.0703(7)(a) of the Wisconsin Statutes. The hearing shall be held before the Common Council at the Council Chambers, Room 406 in the City Hall at a time set by the Clerk in accordance with the Wisconsin Statutes. The assessment against any parcel may be paid in cash, paid with the first property tax installment, or in ten (10) installments if the total amount of the assessment is greater than five hundred dollars ($500.00) or fifteen (15) installments if the total amount of the assessment is greater than one thousand dollars ($1000.00). 7. The installation of said street improvements shall be accomplished according to the provisions of Section 25 -3 through 25 -11 of the Oshkosh Municipal Code. FIGI Ummm NOTICE OF PUBLIC HEARING Office of the City Clerk, City of Oshkosh, Winnebago County, Wisconsin: Please take notice that the City Council of the City of Oshkosh has declared its intention to exercise its power under Section 66.0703(7)(a) of the Wisconsin Statutes, to levy assessments upon property for benefits conferred upon such property by providing the following improvements fronting upon the following described streets: CONTRACT NO 1320 STORM SEWER LATERALS 440 West 7 th Avenue 452 West 7 th Avenue 2385 Abbey Avenue 1833 Doemel Street 931 Dove Street 2207 White Swan Drive The report of the Public Works Director and City Manager showing proposed plans and specifications, estimated costs of improvements, proposed assessments and awards of damages is on file in the Office of the City Clerk and can be inspected there on any business day between the hours of 8 :00 a.m. and 4:30 p.m. Notification that the City Manager (Board of Public Works) and City Council will hear all persons interested or their agents or attorneys concerning the matters in the preliminary resolutions authorizing awards of damages at 6:00 p.m. in the Council Chambers in the City Hall, Oshkosh, Wisconsin on MAY 14, 2013. All objections will be considered at said hearing and thereafter the amount of assessment will be finally determined. CITY OF OSHKOSH PAMELA R. UBRIG PUBLISH: 5/4/2013 CITY CLERK r■ I SPECIAL ASSESSMENT PAYMENT PLAN OPTIONS AFTER CONTRACT NO. 13 -20 IS CERTIFIED AS COMPLETE CONTRACT NO 13 -20 WILL CONSIST OF: STORM SEWER LATERALS 440 West 7 th Avenue 452 West 7 th Avenue 2385 Abbey Avenue 1833 Doemel Street 931 Dove Street 2207 White Swan Drive Included in this mailing, is an estimated amount (quantities and costs) of the special assessment (sheet #5) against your property or properties. A statement of the same is on file in the office of the City Clerk. Once Contract No. 13 -20 is certified as complete by the Public Works Department, the final amount (quantities and costs) of the special assessment against your property or properties will be mailed to you. At that time you will also receive the paperwork to select a payment choice for the special assessments. PAYMENT CHOICE OR PAYMENT IS NOT ACCEPTED AT THIS TIME. THE PAYMENT OPTIONS SHEET YOU WILL RECEIVE AFTER THE CONTRACT IS CERTIFIED AS COMPLETE WILL HAVE THE FOLLOWING OPTIONS: INVOICE - PAYMENT WITHIN 30 DAYS If you choose this option, the City of Oshkosh will then send you a special assessment invoice and you must make payment within thirty days of that notice. If the payment is not made within thirty days after receiving the special assessment invoice, 6% interest accrues from the date of notification. If after making this selection, the property owner fails to make payment to the City Treasurer; the entire amount including interest will be placed on the next property tax bill. TOTAL ASSESSMENT ON NEXT TAX BILL IN FULL Property owners may elect to pay 100% of the assessment on the next designated real estate property tax bill, without interest. The total amount of the assessment will be included on and payable in conjunction with the next designated property tax bill. TEN ANNUAL INSTALLMENT PAYMENTS ON PROPERTY TAX BILL (ASSESSMENT MUST BE IN EXCESS OF $500.00) The amount of the assessment will be placed on the property tax bill with interest at 6% on the unpaid balance per year over the ten- (10) year period. The annual assessment payment and interest will be included in each year's tax bill payment. The assessment balance may be paid in full at any time during the ten -year period, with interest pro -rated to the month of payment. (Applies to assessments in excess of $500.00.) FIFTEEN ANNUAL INSTALLMENT PAYMENTS ON PROPERTY TAX BILL (ASSESSMENT MUST BE IN EXCESS OF $1,000.00) The amount of the assessment will be placed on the property tax bill with interest at 6% on the unpaid balance per year over the fifteen- (15) year period. The annual assessment payment and interest will be included in each year's tax bill payment. The assessment balance may be paid in full at any time during the fifteen -year period, with interest pro -rated to the month of payment. (Applies to assessments in excess of $1,000.00.) CITY OF OSHKOSH PAMELA R. UBRIG CITY CLERK N n l i a U I W. 7TH AVE. i PAGE 1 OF 2 flaname: 440,452 W 7th Ave.dw CITY OF OSHKOSH SMRM LATERAL AsMMtxr ENGINEERING DIVISION CONTRACT NO. DRAWN (NEST SEVENTH AVENUE 13 -20 04-01 -2013 GRAPHIC ° 23 70 100 440, 452. W. 7TH AVENUE SCALE: (IN FEET) I PARCEL I.D. DESCRIPTION OWNER NEW 6" STORM I LATERAL in 09 -0561 -0000 2013 ASSESSMENT RATES-. I��C�IC /�;1;1�►1 NEW STORM SEWER LATERAL = $750.00 EACH TOTALS $1,500.00 ENGINEERING DIVISION CONTRACT NO. DRAWN 13.20 402013 WARD REVISED PAGE 2OF2 STORM SEWER LATERAL SPECIAL ASSESSMENT WEST 7TH AVENUE 440, 452 W. 7TH AVE. N 3 n I 1 i I ABBEY AVE. 2385 D J W Li Z W W Er C9 KINCAID AVE. PAGE 9 OF 2 filename: 2385 Abbey Ave.dw CITY OF OSHKOSH ENGINEERING DIVISION STOW LATERAL ASSESSMENT CONTRACT N0. DRAWN ABBEY AVENUE 13 -20 04 -01 -2013 GRAPHIC a u °0 100 2385 ABBEY AVENUE SCALE: (IN FEET) I PARCEL I.D. DESCRIPTION OWNER NEW 6" STORM I LATERAL 06- 1399 -1400 2385 2013 ASSESSMENT RATES: TOTALS $750.00 PAGE 2OF2 SPECIAL ASSESSMENT NEW STORM SEWER LATERAL WITH DRAIN = $750.00 EACH ENGINEERING DIVISION CONTRACT NO. DRAWN 13 -20 4/2/2013 WARD REVISED ABBEY AVENUE 2385 ABBEY AVE. LARK ST. La z o J m 91 DOVE ST. i I I I PAGE 1 OF 2 Rename: 931 Dove SLew CITY OF OSHKOSH s1oe� u1 AS4�IENT ENGINEERWO DIVISION CONTRACT NO. DRAWN 13 -20 DOVE STREET Oh-01 -2013 ORAPH4 931 DOVE STREET SCALE: (IN FEET) � PARCEL I.D. 16- 0184.0000 DESCRIPTION OWNER NEW 6" STORM LATERAL $750.00 TOTALS $750.00 931 2013 ASSESSMENT RATES: NEW STORM SEWER LATERAL = $750.00 EACH CITY OF OSHKOSH ENGINEERING DIVISION CONTRACT NO. DRAWN 13-20 4/2/2013 WARD REVISED 16TH PAGE 2OF2 SPECIAL ASSESSMENT DOVE STREET 931 DOVE ST. FAiRMEW ST. a Y U O O D Ld 1833 DOEMEL ST. h I PAGE 1 OF 2 i filename: 1833 Doemel S! -dw CITY OF OSHKOSH ENGINEERING DIVISION STORY LATERAL AS5691tNT CONTRACT N0. I DRAWN aOEMEL STREET 13 -20 04-01 -2013 GRAPHIC 0� 23 50 100 1833 DOEMEL SilifFP SCALE: (IN FEED I PARCEL I.D. DESCRIPTION OWNER NEW 6" STORM I LATERAL 15- 1481 -2300 2013 ASSESSMENT RATES. NEW STORM SEWER LATERAL = $750.00 EACH ENGINEERING DIVISION CONTRACT NO. DRAWN 13.20 4!212013 WARD REVISED TOTALS $750.00 fJB7��i7�: SPECIAL ASSESSMENT DOEMEL STREET 1833 DOEMEL ST. N n SOUTH ! ASYLUM I BAY WH17F SWAN DR. 2207 H � V} � J }" LLI Z - -- ............................... m O Ld O 0. O a O Z PAGE 1 OF 2 - filaname: 2207 Mite Swan Dr.d. CITY OF OSHKOSH ENGINEERING DIMSFON STOW LATERAL A SSESSM EM CONTRACT NO. DRAWN 13 -20 04-02 -2013 WHITE SWAN DRIVE GRAPHIC a 25 30 100 2207 WHI7E SWAN DRIVE SCALE: (IN FEET) PARCEL I.D. DESCRIPTION OWNER NEW 6" STORM LATERAL 15- 2160 -0000 2207 WHITE SWAN DR MAJDALANI MR/MRS GHASSAN J $ 750.00 TOTALS $750.00 PAGE 2 OF 2 2013 ASSESSMENT RATES: CITY OF OSHKOSH STORM SEWER LATERAL NEW STORM SEWER LATERAL = $750.00 EACH ENGINEERING DIVISION SPECIAL ASSESSMENT CONTRACT NO. DRAWN 13-2a 41212013 WHITE SWAN DRIVE WARD REVISED 2207 WHITE SWAN DR. 15TH