Loading...
HomeMy WebLinkAbout0155296 - Building (roof) CITY OF OSHKOSH No 155296 OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 1235 HARNEY AVE Owner JEAN E LEHNEN Create Date 04/29/2013 Designer Contractor PEPPLER REMODELING Inspector John Zarate Category 041 -Residential Roofing Plan Type • Building 0 Sign 0 Canopy 0 Fence 0 Raze I Zoning R-2 Class of Const: Size Unfinished/Basement Sq.Ft. Rooms Height _ Ft. ❑ Projection Finished/Living Sq.Ft. Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation • Poured Concrete 0 Floating Slab 0 Pier 0 Other 0 Concrete Block 0 Post 0 Treated Wood Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Not Required Park Dedication Not Required #Dwelling Units 0 #Structures 0 Use/Nature SFR/TEAR OFF AND REPLACE EXISTING ROOFING AND ALUMINUM WITH VINYL SIDING ON THE HOUSE AND GARAGE DUE of Work TO HAIL DAMAGE-NO STRUCTURAL CHANGES HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $23,000.00 Plan Approval $0.00 Permit Fee Paid _ $170.50 Park Dedication $0.00 Issued By: ).h J Date 04/29/2013 Final/O.P. 00/00/0000 ((������ JJ ❑ Permit Voided I Parcel Id#0804600000 In the performance of this work =gree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh . o auth 'ty to enforce easement restrictions of which it is not a party, if you perform the work described in this permit a.•• . ion wi a -asement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure - ecess p •vals before starting such activity. I have read and under- n a re My ioned information. an I� Signature / Date b is Agent/Owner Address W2380 COUNTY Q BERLIN WI 54923 - 0000 Telephone Number 920-361-7731 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.