Loading...
HomeMy WebLinkAbout06. 13-185 APRIL 23, 2013 13-185 RESOLUTION (CARRIED__7-0___ LOST _______ LAID OVER _______ WITHDRAWN _______) PURPOSE: APPROVE PARTIAL RESCISSION OF RESOLUTION 13-126 FOR 2013 ROAD MATERIALS FOR STREET DIVISION AND AWARD BID FOR HOT MIX ASPHALT – PICKED UP TO NORTHEAST ASPHALT, INC. INITIATED BY: PURCHASING DIVISION WHEREAS, the low bid for the hot mix asphalt portion –picked up of this bid was based on the estimated City pickup costs from the City’s Central Garage to the quarry location; and WHEREAS, after the award of bids it was discovered that the quarry location used when calculating the costs for picking up materials was incorrect, resulting in a different low bid for hot mix asphalt; and WHEREAS, Northeast Asphalt, Inc. now qualifies as the low bidder based on the estimated City pickup costs and that the following is the most advantageous bid: NORTHEAST ASPHALT, INC. W6380 Design Drive Greenville, WI 54942 Hot Mix Asphalt – Picked up – 700 Tons more or less Binder – $46.25/ton Surface – $48.25/ton NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that that portion of Resolution 13-126 for 2013 Road Materials pertaining only to Hot Mix Asphalt – picked up is hereby rescinded. BE IT FURTHER RESOLVED that the bid submitted by Northeast Asphalt Inc. specified above for Hot Mix Asphalt – picked up is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. No. 100-0430-6565-00000 – General Fund – Road Materials CITY HALL 215 Church Avenue P.O. Box 1130 Oshkosh, Wisconsin 54903 -1130 City of Oshkosh OfHKOIH TO: Honorable Mayor and Members of the Common Council FROM: Jon Urben, General Services Manager DATE: April 8, 2013 RE: Approve Partial Rescission of Resolution 13 -126 for 2013 Road Materials BACKGROUND At their March 26, 2013 meeting the Common Council approved resolution 13 -126 to award bids for various road materials used by our Street Division throughout the year. ANALYSIS The low bid for the hot mix asphalt portion of this bid is based upon the estimated City pickup costs (labor, truck maintenance and fuel roundtrip) from the city's central garage to the quarry location. The original hot mix asphalt award to MCC Inc. was based on the assumption that their quarry location was in Larsen, WI. Unfortunately, it has since come to our attention that MCC Inc.'s quarry location for hot mix asphalt is in New London or Mackville. Since both of MCC Inc.'s quarry locations are a farther distance than Northeast Asphalt Inc's Larsen quarry location, Purchasing has concluded the original hot mix asphalt award to MCC Inc. was not the low bid. Instead, Purchasing recommends the hot mix asphalt award go to Northeast Asphalt Inc. Both vendors have been contacted about this issue and will comply with this correction. All other road material awards of this bid are unaffected. FISCAL ]IMPACT The hot mix asphalt is one category of the annual road materials purchased out of the Street Division's A/N #: 100 - 0430 -6565- 00000. There is $65,000 budgeted for road materials in 2013. RECOMMENDATION Purchasing recommends the Common Council rescind the hot mix asphalt award portion of resolution 13 -126 and award it to Northeast Asphalt, Inc. Respectfull Submitted, Jon Urben, General Services Manager Approved: Mark Rohloff, City Manager C«1 ROAD MATERIALS - 2013 - 2014 BIDS OPENED - MARCH 8, 2013 DESCRIPTION Northeast Asphalt Inc W6380 Design Drive Greenville WI 54942 Carew Concrete 1811 W Edgewood Drive Appleton WI 54913 MCC Inc 2600 N Roemer Road T Appleton WI 54912 Michels Materials 700 Tullar Raod Neenah WI 54956 BREAKER RUN 6" PICKED UP 1,000 TONS MORE OR LESS No Bid No Bid $5.45 Larsen aa s � ;; 31 ; Qiq ' «E _TT BREAKER RUN 3" PICKED UP 1,000 TONS MORE OR LESS No Bid No Bid $5.45 Larsen OSf1Q5h; j ` i f� PL:� .H', j i3, j3i7`33i�e: H} 11� }i Fli°I�' 1 114" BASE COURSE PICKED UP 2 TONS MORE OR LESS No Bid No Bid $5.45 Larsen $�ZSOshosb, ?ii99s�i4? 314" BASE COURSE PICKED UP 600 TONS MORE OR LESSil No Bid No Bid $5.45 Larsen 72 D h-A's 314" CLEAR STONE PICKED UP 200 TONS MORE OR LESS No Bid No Bid $5.45 Larsen $8 0"0` iTigs; Ei ss is�4E '( €1av i3 ',e9e 318" CRUSHED LIMESTONE WIFINES PICKED UP 50 TONS MORE OR LESS No Bid No Bid No Bid p ¢ ' bF4s��e; aP te. �¢c aeasa asace;.sSi;:S= ki?�r,s°.'_n�;n:- READY -MIX CONCRETE Delivered 3,000 PSI PER C.Y. or 5 BAG MIX No Bid $79.00 $70;;OU'epEe =siEesP'e No Bid 4,000 PSI PER C.Y. or 6 BAG MIX No Bid $84.00 I gw $7,4`Dd1 ° , ° � ? ?�pp €�sF`� i °�.9 No Bid 5,000 PSI PER C.Y OR 7 BAG MIX No Bid $89.00 El '; No Bid 7,000 PSI PER C.Y. or 8 BAG MIX No Bid $94.00 '.. E913939 3. 9. E9Ee:e s°; 4„ cE; ;9E6E,yP6:EtE9"tf�"���4+i> }i3 i No Sid 8,000+ PSI PER C.Y. or 9 BAG MIX No Bid $99.00 byedoa }:+ae:e.9e }s§le f6,�FY y£S�ii'�3�33 $86Q; , e3.°il3;l a i;e.Pil il.i` =.< =#t; =.;:t =Et 1 No Bid P= �plir�3e +$PiA7ii4�ii:7??31N'r'r^:Ia, ;:» ; E¢cre(.;;:;aPi ;:.�::zeua:ECgc',r 500 TONS MORE OR LESS #2 Slurry PER C.Y. No Bid $54.00 $53 ,, '1,,,'',�Il €��;;�`'�ia� No Bid Hot Water $4.00 Winter Service $8.00 Heat Charge Nov 1 - Mar 31 $8.00 MINIMUM DELIVERY CHARGE <4 yds $90.001yd <4 yds $80.00 /yd FUEL SURCHARGE $20.00 Diesel > $4.501gl + $15.001trip Sat or Weekdays After 4:00 $7.00 yd Saturday $8.00 1yd HOT MIX ASPHALT PICKED UP 700 TONS MORE OR LESS Binder $4E''....... ..... .. $44. 00 New London or Mackville N o Bid Surface $g8rseri „�gi9E;: ; $46.50 New London or Mackville NO Bid COLD MIX PICKED UP SC250 700 TONS MORE OR LESS DELIVERED .$75501tylnasha °Bi;i; No Bid No Bid No Bid No Bid No Bid Portland Cement Type 1 50 Sags PICKED UP 47# BAGS No Bid $5 74,OsFlkosh,or Ape£an is No Bid No Bid *Determined to be lowest bid when factoring in estimated City pickup cost (labor, truck maintenance & fuel oosts roundtrip) from Central Garage to quart' location