HomeMy WebLinkAbout0155022 - Building (gravel/concrete outdoor storage) CITY OF OSHKOSH No 155022
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 455 W WAUKAU AVE Owner KINGSBURY REAL ESTATE HOLDINGS LLC Create Date 03/21/2013
Designer Gene Thom Contractor OWNER
Inspector Nicole Krahn
Category 211 -Alteration Industrial Plan
Type • Building O Sign O Canopy O Fence 0 Raze - J
Zoning M-3 Class of Const: Size _
Unfinished/Basement Sq. Ft. Rooms Height FL ❑ Projection
Finished/Living Sq.Ft. Bedrooms Stories Canopies
Garage Sq.Ft. Baths Signs
Foundation • Poured Concrete O Floating Slab O Pier O Other
0 Concrete Block 0 Post O Treated Wood
Occupancy Permit _ Occupancy Fee $0.00 Flood Plain Height Permit
Park Dedication #Dwelling Units 0 #Structures 0
Use/Nature Industrial--concrete existing gravel outdoor storage area located behind 40x100 fenced area per submitted site plan. Existing 6'tall fence�
of Work with slats will remain. "check#46407
HVAC Contractor Plumbing Contractor _
Electric Contractor
Fees: Valuation $13,500.00 Plan Approval $0.00 Permit Fee Paid $324.00 Park Dedication $0.00
Issued By:an W` Date 04/12/2013 Final/O.P. 00/00/0000
❑ Permit Voided Parcel Id# 1413620100
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to secure any necessary approval be such activity.
I have read and deistand the afore men• ne inform n. _ 7
Signature Date /G -7c)(5.>
Agent/Owner
Address Oshkosh _ WI 54901 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection (i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.