APRIL 9, 2013 13-174 RESOLUTION
(CARRIED __6-0____ LOST _______ LAID OVER _______ WITHDRAWN_____)
PURPOSE: GRANT NOISE VARIANCE TO INTEGRITY GRADING AND
EXCAVATING, INC. TO ALLOW CONSTRUCTION ACTIVITIES
TO BEGIN AT 6:00 A.M. / PUBLIC WORKS FIELD OPERATIONS
FACILITY
INITATED BY: INTEGRITY GRADING AND EXCAVATING, INC.
WHEREAS, the City of Oshkosh has adopted a noise ordinance limiting the
amount of noise at a property line; and
WHEREAS, the regulation of noise is generally more stringent between the hours
of 10:00 p.m. and 7:00 a.m.; and
WHEREAS, the ordinance provides that the Common Council may waive the
requirements of the ordinance if the Council determines that circumstances exist that
would make compliance with the noise limitations an unnecessary hardship to the
applicant; and
WHEREAS, in making this determination the Council is to consider:
(1) the hardship to the applicant, the community, and other persons of not
granting the variance;
(2) the adverse impact on health, safety, and welfare of persons owning,
residing, or occupying property in the surrounding area and the public
in general;
(3) the adverse effect on surrounding property;
(4) whether the circumstance, hardship, or situation to be addressed by
the proposed variance is unique, and not applicable generally to other
circumstances;
(5) whether the person or entity seeking the variance is otherwise in
compliance with all applicable ordinances, regulations and statutes;
and
(6) any other adverse impacts of granting the variance.
WHEREAS, a request for a variance has been filed by Integrity Grading and
Excavating, Inc. to allow construction work to begin at 6:00 a.m. for the Public Works
Field Operations Facility located at 639 Witzel Avenue to allow them to make optimal
use of the day by loading trucks and transporting materials to the landfill site for delivery
when the landfill site opens at 7:00 a.m. for an approximately two week period
beginning in May 2013.
APRIL 9, 2013 13-174 RESOLUTION
CONT'D
NOW, THEREFORE, BE IT RESOLVED by the Common Council for the City of
Oshkosh has considered the criteria pertaining to the granting of a variance to the City's
noise ordinance and hereby grants such variance to Integrity Grading and Excavating,
Inc. to allow construction work to begin at 6:00 a.m. during the month of May 2013.
605 Grossman Drive • Schofield,WI 54476 • TEL 715.359.4042 • FAx 715.359.4142 • www.integrityge.corn
INTEGRITY
GRADING 8c
EXCAVATING
April 4, 2013
City of Oshkosh
215 Church Avenue
Oshkosh, WI 54903-1130
Dear Mr. Rohloff:
Integrity Grading and Excavating, Inc. was the apparent low bidder
on the Impacted Soil Excavation project that was bid on 4/2/2013.
We would like to request approval of the variance to the time that
we can start construction operations. We are requesting to start at
6:00am in order for the trucks to be at the landfill when it opens at
7:00am to allow for optimum production for the City of Oshkosh.
IGE anticipates starting in May and it should take us approximately
two weeks.
We look forward to working with you on this project. Thank you for
your time and consideration.
Respectfully,
Daniel Weinkauf
Project Manager
Integrity Grading and Excavating, Inc.
Site Development • Roadways • Environmental Clean-up • Excavation • Snow Removal AN EQUAL
,art► ' z - --
OPPORTUNITY