HomeMy WebLinkAbout0154920-Building � CITY OF OSHKOSH No ��s2o
�
OSHKOSH COMMERCIAL BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 304 OTTER AVE Create Date 04/01/2013
Project Group Home Project Number 20130402
Owner OSHKOSH OTTER AVE LLC Plan Z5-3723-0313
Contractor DAVIS BUILDING SERVICE LLC
Inspector John Zarate
Designer Paul Twardy
Category 132-Multi-Family Alterations Type of Plan Alt. Level 3
Zoning C-3 Square Footage
Major Occ R4 Residential Const Class Type VB
Fire Protection � Sprinkled � Unsprinkled � Sprinkler Design NFPA 13R
Occupancy Permit Required Flood Plain Height Permit
Park Dedication #Dwelling Units 0 #Structures 0
� Projection � Canopies Signs
Use/Nature
of Work
OMM/14 bed Group Home'To be constructed within existing building. Altered space shall comply with all applicable codes.
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $86,500.00 Plan Approval $0.00 Permit Fee Paid $972.00 Park Dedication $0.00
Issued By: �(.,J Date 04/03/2013 Final/O.P. 00/00/0000
� Permit Voided I Parcel Id#0200500000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to secure any necessary approvals before starting such activity.
I have read and dersta the re entioned information.
Signature �I �'`��-' � � Date L��a/� �
Agent/Owner
Address 21 THACKERY DR OSHKOSH WI 54904 -7140 Telephone Number (920)379-6559
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.