HomeMy WebLinkAbout0154903-Building (temporary ramp) � CITY OF OSHKOSH No 154903
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 526 CENTRAL ST Owner AMY RODRIGUEZ Create Date 04/02/2013
Designer Contractor BADGERLAND EXTERIORS
Inspector John Zarate
Category 142-Decks, Patios, Ramps Plan
Type � Building � Sign � Canopy � Fence � Raze '
�
Zoning R-2PD Class of Const: Size
Unfinished/Basement Sq.Ft. Rooms Height Ft. � Projection i
Finished/Living Sq.Ft. Bedrooms Stories Canopies
Garage Sq.Ft. Baths Signs
Foundation � Poured Concrete � Floating Slab � Pier � Other
� Concrete Block � Post � Treated Wood
Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit
Park Dedication _ #Dwelling Units 0 #Structures 0
Use/Nature SFR/Temorary ramp*to be constructed in the rear yard. The ramp shall be taken down prior to Dec 31,2013 unless it is made
of Work permanent including frost protection. '
�
�
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $2,500.00 Plan Approval $0.00 Permit Fee Paid $51.00 Park Dedication $0.00
�
Issued By: Date 04/02/2013 Final/O.P. 00/00/0000
❑ Permit Voided I Parcel Id#0704100000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to secure any necessary approvals before starting such activity.
I have read and un e tand the afor mentio information.
Signature � .� Date � '��',� 3
e
AgenUOwner
Address 1039 N.SAWYER ST. Oshkosh WI 54901 - 0000 Telephone Number 608-370-1514
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not perFormed within two business days from the time the project is ready.