Loading...
HomeMy WebLinkAbout0154903-Building (temporary ramp) � CITY OF OSHKOSH No 154903 OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 526 CENTRAL ST Owner AMY RODRIGUEZ Create Date 04/02/2013 Designer Contractor BADGERLAND EXTERIORS Inspector John Zarate Category 142-Decks, Patios, Ramps Plan Type � Building � Sign � Canopy � Fence � Raze ' � Zoning R-2PD Class of Const: Size Unfinished/Basement Sq.Ft. Rooms Height Ft. � Projection i Finished/Living Sq.Ft. Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation � Poured Concrete � Floating Slab � Pier � Other � Concrete Block � Post � Treated Wood Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication _ #Dwelling Units 0 #Structures 0 Use/Nature SFR/Temorary ramp*to be constructed in the rear yard. The ramp shall be taken down prior to Dec 31,2013 unless it is made of Work permanent including frost protection. ' � � HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $2,500.00 Plan Approval $0.00 Permit Fee Paid $51.00 Park Dedication $0.00 � Issued By: Date 04/02/2013 Final/O.P. 00/00/0000 ❑ Permit Voided I Parcel Id#0704100000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. I have read and un e tand the afor mentio information. Signature � .� Date � '��',� 3 e AgenUOwner Address 1039 N.SAWYER ST. Oshkosh WI 54901 - 0000 Telephone Number 608-370-1514 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not perFormed within two business days from the time the project is ready.